IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

348

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0302 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $61,184 $15,000 Not Implemented
TT0302 # 01 Y:2023 01 2023 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $141,741 $909,720 Implemented
TT0302 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,359 $90,000 Not Implemented
TT0302 # 08 Y:2023 08 2023 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $2,956 $965 Not Implemented
TT0302 # 05 Y:2023 05 2023 METER WASTE WATER $18,930 $1,100 Implemented
TT0302 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,886 $0 Not Implemented
TT0302 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,127 $1,500 Implemented
TT0302 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,990 $20,000 Not Implemented
TT0298 # 08 Y:2023 08 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,325 $22,800 n/a
TT0298 # 01 Y:2023 01 2023 MINIMIZE WATER USAGE $54,343 $42,000 n/a
TT0298 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,545 $31,800 n/a
TT0298 # 11 Y:2023 11 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,983 $9,000 n/a
TT0298 # 03 Y:2023 03 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $26,893 $45,000 n/a
TT0298 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $32,300 $196,225 n/a
TT0298 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,862 $9,000 n/a
TT0298 # 10 Y:2023 10 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,044 $13,500 n/a
TT0298 # 13 Y:2023 13 2023 RECOVER WASTE HEAT FROM EQUIPMENT $3,689 $9,000 n/a
TT0298 # 12 Y:2023 12 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,575 $2,010 n/a
TT0298 # 06 Y:2023 06 2023 ADOPT IN-HOUSE MATERIAL GENERATION $20,290 $61,440 n/a
TT0298 # 05 Y:2023 05 2023 ISOLATE HOT OR COLD EQUIPMENT $25,424 $60,000 n/a
TT0298 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $26,094 $85,000 n/a
TT0297 # 08 Y:2023 08 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $735 $750 n/a
TT0297 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $8,533 $20,000 n/a
TT0297 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $49,703 $203,650 n/a
TT0297 # 07 Y:2023 07 2023 REUSE RICH WHITE WATER IN OTHER APPLICATIONS $1,230 $1,820 n/a