IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,559

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0415 # 09 Y:2009 09 2009 INSTALL OCCUPANCY SENSORS $154 $347 Implemented
SF0370 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $316 $0 Not Implemented
SF0370 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,936 $2,464 Not Implemented
SF0370 # 03 Y:2009 03 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $684 $849 Not Implemented
SF0370 # 04 Y:2009 04 2009 INSULATE BARE EQUIPMENT $942 $2,473 Not Implemented
SF0370 # 05 Y:2009 05 2009 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $972 $2,956 Not Implemented
SF0370 # 06 Y:2009 06 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $1,614 $7,537 Not Implemented
SF0370 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $1,231 $10,326 Not Implemented
SF0370 # 08 Y:2009 08 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $74,612 $654,810 Not Implemented
TT0034 # 01 Y:2009 01 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,000 $47,500 Not Implemented
TT0034 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,800 $2,500 Not Implemented
TT0034 # 03 Y:2009 03 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,250 $4,800 Not Implemented
TT0034 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,900 $800 Implemented
TT0034 # 05 Y:2009 05 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,300 $20,000 Not Implemented
TT0034 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,950 $5,000 Not Implemented
TT0034 # 07 Y:2009 07 2009 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,000 $0 Implemented
TT0034 # 08 Y:2009 08 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,400 $0 Implemented
AM0556 # 01 Y:2009 01 2009 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $110,800 $325,000 Not Implemented
AM0556 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,000 $36,100 Implemented
AM0556 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,800 $1,000 Implemented
AM0556 # 04 Y:2009 04 2009 OPTIMIZE PLANT POWER FACTOR $6,510 $21,230 Not Implemented
AM0556 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,650 $11,713 Implemented
AM0556 # 06 Y:2009 06 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,980 $3,900 Not Implemented
AM0556 # 07 Y:2009 07 2009 INSTALL SKYLIGHTS $3,200 $4,140 Not Implemented
AM0556 # 08 Y:2009 08 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,290 $1,000 Implemented