Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,559
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0268 # 01 Y:2008 | 01 | 2008 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $331,483 | $16,000 | Not Implemented |
LE0268 # 02 Y:2008 | 02 | 2008 | USE SOLAR HEAT TO MAKE ELECTRICTY | $104,249 | $671,675 | Not Implemented |
LE0268 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $71,498 | $60,000 | Not Implemented |
LE0268 # 04 Y:2008 | 04 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $25,491 | $15,000 | Not Implemented |
LE0268 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,931 | $0 | Implemented |
LE0268 # 06 Y:2008 | 06 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $42,587 | $65,000 | Not Implemented |
LE0268 # 07 Y:2008 | 07 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,832 | $2,200 | Not Implemented |
LE0268 # 08 Y:2008 | 08 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,134 | $700 | Not Implemented |
LE0268 # 09 Y:2008 | 09 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $931 | $0 | Implemented |
LE0268 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,056 | $46,378 | Not Implemented |
LE0268 # 11 Y:2008 | 11 | 2008 | INSTALL OCCUPANCY SENSORS | $2,089 | $780 | Not Implemented |
MA0629 # 01 Y:2008 | 01 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,363 | $2,800 | Implemented |
MA0629 # 02 Y:2008 | 02 | 2008 | OPTIMIZE PLANT POWER FACTOR | $1,935 | $2,100 | Not Implemented |
MA0629 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,726 | $6,800 | Not Implemented |
MA0629 # 04 Y:2008 | 04 | 2008 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $1,367 | $3,000 | Not Implemented |
MA0629 # 05 Y:2008 | 05 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $450 | $1,620 | Implemented |
MA0629 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $351 | $400 | Implemented |
MA0629 # 07 Y:2008 | 07 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $247 | $200 | Implemented |
MA0627 # 01 Y:2008 | 01 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $52,302 | $35,000 | Implemented |
MA0627 # 02 Y:2008 | 02 | 2008 | REDUCE VENTILATION AIR | $8,813 | $16,000 | Implemented |
MA0627 # 03 Y:2008 | 03 | 2008 | OPTIMIZE PLANT POWER FACTOR | $6,984 | $8,550 | Implemented |
MA0627 # 04 Y:2008 | 04 | 2008 | USE MINIMUM SAFE OVEN VENTILATION | $6,674 | $5,000 | Not Implemented |
MA0627 # 05 Y:2008 | 05 | 2008 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,648 | $4,300 | Not Implemented |
MA0627 # 06 Y:2008 | 06 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $948 | $1,000 | Implemented |
WV0369 # 01 Y:2008 | 01 | 2008 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $108,677 | $0 | Implemented |