IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

400

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0294 # 05 Y:1989 05 1989 INSULATE BARE EQUIPMENT $1,104 $600 Implemented
KU0294 # 06 Y:1989 06 1989 RECOVER WASTE HEAT FROM EQUIPMENT $526 $200 Implemented
KU0294 # 07 Y:1989 07 1989 TURN OFF EQUIPMENT WHEN NOT IN USE $579 $0 Implemented
KU0277 # 01 Y:1989 01 1989 REDUCE VENTILATION AIR $7,959 $2,250 Not Implemented
KU0277 # 02 Y:1989 02 1989 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,065 $2,775 Not Implemented
KU0277 # 03 Y:1989 03 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,439 $3,600 Not Implemented
KU0277 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,101 $2,112 Not Implemented
KU0277 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,474 $300 Not Implemented
KU0277 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $390 $766 Not Implemented
KU0277 # 07 Y:1989 07 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $948 $0 Not Implemented
KU0277 # 08 Y:1989 08 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $504 $700 Not Implemented
KU0277 # 09 Y:1989 09 1989 IMPROVE LUBRICATION PRACTICES $457 $0 Not Implemented
KU0220 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,362 $3,200 Implemented
KU0220 # 02 Y:1987 02 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,475 $600 Not Implemented
KU0220 # 03 Y:1987 03 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $280 $0 Implemented
KU0220 # 04 Y:1987 04 1987 COVER OPEN TANKS $756 $70 Not Implemented
KU0220 # 05 Y:1987 05 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $113 $10 Implemented
KU0190 # 01 Y:1986 01 1986 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,383 $50 Implemented
KU0190 # 02 Y:1986 02 1986 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $215 $0 Implemented
KU0190 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,038 $1,510 Implemented
KU0190 # 04 Y:1986 04 1986 IMPROVE LUBRICATION PRACTICES $1,009 $600 Not Implemented
KU0190 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $658 $120 Implemented
KU0190 # 06 Y:1986 06 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $673 $10 Implemented
KU0190 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $249 $50 Implemented
KU0190 # 08 Y:1986 08 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $207 $0 Implemented