Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
400
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0294 # 05 Y:1989 | 05 | 1989 | INSULATE BARE EQUIPMENT | $1,104 | $600 | Implemented |
KU0294 # 06 Y:1989 | 06 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $526 | $200 | Implemented |
KU0294 # 07 Y:1989 | 07 | 1989 | TURN OFF EQUIPMENT WHEN NOT IN USE | $579 | $0 | Implemented |
KU0277 # 01 Y:1989 | 01 | 1989 | REDUCE VENTILATION AIR | $7,959 | $2,250 | Not Implemented |
KU0277 # 02 Y:1989 | 02 | 1989 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,065 | $2,775 | Not Implemented |
KU0277 # 03 Y:1989 | 03 | 1989 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,439 | $3,600 | Not Implemented |
KU0277 # 04 Y:1989 | 04 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,101 | $2,112 | Not Implemented |
KU0277 # 05 Y:1989 | 05 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,474 | $300 | Not Implemented |
KU0277 # 06 Y:1989 | 06 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $390 | $766 | Not Implemented |
KU0277 # 07 Y:1989 | 07 | 1989 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $948 | $0 | Not Implemented |
KU0277 # 08 Y:1989 | 08 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $504 | $700 | Not Implemented |
KU0277 # 09 Y:1989 | 09 | 1989 | IMPROVE LUBRICATION PRACTICES | $457 | $0 | Not Implemented |
KU0220 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,362 | $3,200 | Implemented |
KU0220 # 02 Y:1987 | 02 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,475 | $600 | Not Implemented |
KU0220 # 03 Y:1987 | 03 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $280 | $0 | Implemented |
KU0220 # 04 Y:1987 | 04 | 1987 | COVER OPEN TANKS | $756 | $70 | Not Implemented |
KU0220 # 05 Y:1987 | 05 | 1987 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $113 | $10 | Implemented |
KU0190 # 01 Y:1986 | 01 | 1986 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,383 | $50 | Implemented |
KU0190 # 02 Y:1986 | 02 | 1986 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $215 | $0 | Implemented |
KU0190 # 03 Y:1986 | 03 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,038 | $1,510 | Implemented |
KU0190 # 04 Y:1986 | 04 | 1986 | IMPROVE LUBRICATION PRACTICES | $1,009 | $600 | Not Implemented |
KU0190 # 05 Y:1986 | 05 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $658 | $120 | Implemented |
KU0190 # 06 Y:1986 | 06 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $673 | $10 | Implemented |
KU0190 # 07 Y:1986 | 07 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $249 | $50 | Implemented |
KU0190 # 08 Y:1986 | 08 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $207 | $0 | Implemented |