IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,551

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0831 # 08 Y:2022 08 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,654 $15,630 Not Implemented
MA0831 # 09 Y:2022 09 2022 INSULATE FEEDWATER TANK $798 $1,376 Implemented
MI0398 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,694 $1,650 Not Implemented
MI0398 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,526 $2,020 Not Implemented
MI0398 # 03 Y:2021 03 2021 USE DEMAND CONTROLLER OR LOAD SHEDDER $12,084 $100 Not Implemented
MI0398 # 04 Y:2021 04 2021 PAY UTILITY BILLS ON TIME $11,152 $0 Not Implemented
MI0398 # 05 Y:2021 05 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,350 $849 Not Implemented
MI0398 # 06 Y:2021 06 2021 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $5,300 $9,444 Not Implemented
MI0398 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,388 $4,059 Not Implemented
MI0398 # 08 Y:2021 08 2021 USE PHOTOCELL CONTROLS $1,120 $4,014 Not Implemented
WM0167 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,266 $0 Not Implemented
WM0167 # 02 Y:2021 02 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,789 $0 Not Implemented
WM0167 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,554 $0 Implemented
WM0167 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,549 $6,864 Not Implemented
WM0167 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,131 $4,911 Not Implemented
WM0167 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $487 $2,035 Not Implemented
WM0167 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $184 $200 Not Implemented
SU0508 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $33 $0 Not Implemented
SU0508 # 02 Y:2021 02 2021 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $775 $81 Not Implemented
SU0508 # 03 Y:2021 03 2021 REDUCE VENTILATION AIR $2,405 $499 Not Implemented
SU0508 # 04 Y:2021 04 2021 INSTALL / REPAIR INSULATION ON STEAM LINES $202 $107 Not Implemented
SU0508 # 05 Y:2021 05 2021 ELIMINATE/REDUCE AN OPERATION $4,431 $5,566 Not Implemented
SU0508 # 06 Y:2021 06 2021 RECOVER WASTE HEAT FROM EQUIPMENT $12,878 $15,784 Not Implemented
SU0508 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $875 $1,160 Not Implemented
SU0508 # 08 Y:2021 08 2021 INSTALL OCCUPANCY SENSORS $3,900 $5,861 Not Implemented