IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

155

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0176 # 06 Y:1985 06 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $188 $60 Implemented
KU0176 # 05 Y:1985 05 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $203 $0 Implemented
KU0176 # 04 Y:1985 04 1985 REDUCE VENTILATION AIR $227 $200 Not Implemented
KU0176 # 03 Y:1985 03 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $618 $1,200 Not Implemented
KU0176 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,562 $1,540 Implemented
KU0176 # 01 Y:1985 01 1985 INSTALL AUTOMATIC STACK DAMPER $1,232 $1,875 Not Implemented
KU0168 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $140 $0 Not Implemented
KU0168 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68 $912 Not Implemented
KU0168 # 02 Y:1985 02 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $842 $200 Not Implemented
KU0168 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,947 $125 Implemented
KU0160 # 06 Y:1985 06 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $433 $200 Not Implemented
KU0160 # 05 Y:1985 05 1985 INSULATE BARE EQUIPMENT $188 $60 Not Implemented
KU0160 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $371 $192 Not Implemented
KU0160 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,662 $2,000 Implemented
KU0160 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,982 $900 Implemented
KU0160 # 01 Y:1985 01 1985 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,445 $10,000 Implemented
KU0152 # 03 Y:1985 03 1985 USE OPTIMUM TEMPERATURE $2,973 $2,000 Implemented
KU0152 # 04 Y:1985 04 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,676 $149 Implemented
KU0152 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $859 $0 Implemented
KU0152 # 06 Y:1985 06 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,085 $2,160 Not Implemented
KU0152 # 07 Y:1985 07 1985 REDUCE VENTILATION AIR $877 $100 Implemented
KU0152 # 08 Y:1985 08 1985 INSTALL AUTOMATIC STACK DAMPER $176 $600 Implemented
KU0152 # 12 Y:1985 12 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $189 $20 Implemented
KU0152 # 02 Y:1985 02 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,286 $1,500 Not Implemented
KU0152 # 13 Y:1985 13 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $209 $0 Implemented