Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
150
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0640 # 05 Y:2008 | 05 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $1,895 | $3,000 | Implemented |
MA0640 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $977 | $0 | Implemented |
MA0640 # 07 Y:2008 | 07 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $644 | $689 | Implemented |
MA0629 # 01 Y:2008 | 01 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,363 | $2,800 | Implemented |
MA0629 # 02 Y:2008 | 02 | 2008 | OPTIMIZE PLANT POWER FACTOR | $1,935 | $2,100 | Not Implemented |
MA0629 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,726 | $6,800 | Not Implemented |
MA0629 # 04 Y:2008 | 04 | 2008 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $1,367 | $3,000 | Not Implemented |
MA0629 # 05 Y:2008 | 05 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $450 | $1,620 | Implemented |
MA0629 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $351 | $400 | Implemented |
MA0629 # 07 Y:2008 | 07 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $247 | $200 | Implemented |
MA0546 # 01 Y:2004 | 01 | 2004 | INSTALL OCCUPANCY SENSORS | $16,130 | $4,480 | Not Implemented |
MA0546 # 02 Y:2004 | 02 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $13,348 | $4,712 | n/a |
MA0546 # 03 Y:2004 | 03 | 2004 | INSULATE BARE EQUIPMENT | $11,157 | $1,992 | Not Implemented |
MA0546 # 04 Y:2004 | 04 | 2004 | REDUCE VENTILATION AIR | $7,495 | $1,200 | Implemented |
MA0546 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,827 | $4,972 | Implemented |
MA0546 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,243 | $3,230 | Implemented |
MA0546 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,839 | $282 | Not Implemented |
MA0546 # 08 Y:2004 | 08 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $981 | $720 | Not Implemented |
MA0546 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $832 | $3,000 | Implemented |
MA0507 # 01 Y:2002 | 01 | 2002 | ADOPT IN-HOUSE MATERIAL GENERATION | $69,744 | $194,100 | Implemented |
MA0507 # 02 Y:2002 | 02 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,237 | $40,000 | Not Implemented |
MA0507 # 03 Y:2002 | 03 | 2002 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,940 | $4,000 | Not Implemented |
MA0507 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,037 | $35,500 | Not Implemented |
MA0507 # 05 Y:2002 | 05 | 2002 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $795 | $3,230 | Implemented |
MA0507 # 06 Y:2002 | 06 | 2002 | PAY BILLS ON TIME TO AVOID LATE FEES | $576 | $0 | Implemented |