IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0445 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,158 $24,137 Not Implemented
UM0445 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $790 $500 Not Implemented
IC0149 # 10 Y:2008 10 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,263 $0 Implemented
IC0149 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,460 $9,635 Implemented
IC0149 # 02 Y:2008 02 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,168 $18,015 Not Implemented
IC0149 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $1,470 $7,381 Implemented
IC0149 # 11 Y:2008 11 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,626 $0 Not Implemented
IC0149 # 09 Y:2008 09 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $849 $0 Implemented
IC0149 # 08 Y:2008 08 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $37,783 $29,280 Implemented
IC0149 # 07 Y:2008 07 2008 UPGRADE OBSOLETE EQUIPMENT $19,706 $210 Implemented
IC0149 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,594 $1,610 Implemented
IC0149 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $141 $0 Implemented
IC0149 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,526 $2,040 Implemented
UM0129 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $24,159 $17,000 Not Implemented
UM0129 # 06 Y:1999 06 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $3,463 $19,860 Not Implemented
UM0129 # 05 Y:1999 05 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $56,391 $122,400 Not Implemented
UM0129 # 03 Y:1999 03 1999 REPLACE BOILER $78,528 $13,800 Not Implemented
UM0129 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,707 $23,612 Not Implemented
UM0129 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,119 $13,195 Not Implemented
UM0017 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,369 $1,100 Implemented
UM0017 # 06 Y:1995 06 1995 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,090 $2,500 Not Implemented
UM0017 # 05 Y:1995 05 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,232 $0 Implemented
UM0017 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,199 $4,680 Not Implemented
UM0017 # 03 Y:1995 03 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,994 $35 Not Implemented
UM0017 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,281 $16,346 Implemented