IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,551

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0012 # 06 Y:1984 06 1984 INSTALL TIMERS AND/OR THERMOSTATS $16,597 $4,000 Implemented
CO0012 # 07 Y:1984 07 1984 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $1,984 $1,160 Implemented
CO0012 # 08 Y:1984 08 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $241 $17 Implemented
TN0218 # 01 Y:1984 01 1984 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $8,908 $15,000 Not Implemented
TN0218 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,382 $0 Not Implemented
TN0218 # 03 Y:1984 03 1984 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,352 $3,700 Implemented
TN0218 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,746 $180 Not Implemented
TN0218 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,078 $4,350 Not Implemented
TN0218 # 06 Y:1984 06 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $758 $0 Not Implemented
TN0218 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $677 $90 Implemented
OK0147 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,160 $900 Implemented
OK0147 # 02 Y:1984 02 1984 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $509 $131 Implemented
OK0147 # 03 Y:1984 03 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,650 $6,252 Implemented
OK0147 # 04 Y:1984 04 1984 HEAT WATER WITH EXHAUST HEAT $7,174 $6,955 Not Implemented
OK0147 # 05 Y:1984 05 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,120 $1,236 Implemented
OK0147 # 06 Y:1984 06 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $566 $333 Implemented
OK0147 # 07 Y:1984 07 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,671 $1,647 Implemented
OK0147 # 08 Y:1984 08 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,036 $720 Implemented
OK0147 # 09 Y:1984 09 1984 INSTALL TIMERS AND/OR THERMOSTATS $492 $291 Implemented
OK0147 # 10 Y:1984 10 1984 TURN OFF EQUIPMENT WHEN NOT IN USE $6,362 $1,090 Implemented
UD0137 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $6,700 $3,000 Implemented
UD0137 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $809 $1,894 Not Implemented
TN0216 # 01 Y:1984 01 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,564 $4,000 Not Implemented
TN0216 # 02 Y:1984 02 1984 INSTALL SET-BACK TIMERS $8,300 $0 Implemented
TN0216 # 03 Y:1984 03 1984 COVER OPEN TANKS $1,096 $75 Not Implemented