IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,551

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0418 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $729 $1,308 Not Implemented
MI0301 # 01 Y:2016 01 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $15,850 $1,120 Not Implemented
MI0301 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,990 $35,099 Implemented
MI0301 # 03 Y:2016 03 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,246 $2,379 Not Implemented
MI0301 # 04 Y:2016 04 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,075 $18,626 Not Implemented
MI0301 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,096 $322 Not Implemented
MI0301 # 06 Y:2016 06 2016 USE OPTIMUM THICKNESS INSULATION $2,946 $2,710 Not Implemented
MI0301 # 07 Y:2016 07 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,197 $2,146 Not Implemented
MI0301 # 08 Y:2016 08 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $1,288 $8,881 Implemented
MI0301 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $1,252 $2,200 Implemented
MI0301 # 10 Y:2016 10 2016 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $580 $3,880 Not Implemented
MI0301 # 11 Y:2016 11 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $540 $280 Implemented
OK0942 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,767 $3,112 Implemented
OK0942 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,283 $8,000 Not Implemented
OK0942 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $4,623 Implemented
OK0942 # 04 Y:2016 04 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $73,902 $31,000 Not Implemented
OK0942 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $600 $3,450 Implemented
OK0942 # 06 Y:2016 06 2016 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $469,328 $2,302,430 Not Implemented
MZ0213 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $1,940 $1,100 Implemented
MZ0213 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $29,759 $2,500 Not Implemented
MZ0213 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,111 $2,000 Not Implemented
MZ0213 # 04 Y:2016 04 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $11,560 $67,500 Not Implemented
MZ0213 # 05 Y:2016 05 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,875 $6,000 Implemented
SU0412 # 01 Y:2016 01 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $154 $0 Not Implemented
SU0412 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,342 $480 Not Implemented