Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,559
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0462 # 08 Y:2015 | 08 | 2015 | INSTALL TURBULATORS | $595 | $1,160 | Not Implemented |
BD0462 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $396 | $325 | Not Implemented |
BD0462 # 10 Y:2015 | 10 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $29 | $54 | Not Implemented |
BD0462 # 11 Y:2015 | 11 | 2015 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $15,189 | $2,000 | Not Implemented |
BD0462 # 12 Y:2015 | 12 | 2015 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $7,464 | $6,000 | Not Implemented |
BD0462 # 13 Y:2015 | 13 | 2015 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $6,060 | $300 | Not Implemented |
NC0538 # 01 Y:2015 | 01 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $17,825 | $50,000 | Not Implemented |
NC0538 # 02 Y:2015 | 02 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,806 | $21,000 | Not Implemented |
NC0538 # 03 Y:2015 | 03 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,306 | $1,700 | Not Implemented |
NC0538 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,255 | $20,000 | Not Implemented |
NC0538 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $828 | $100 | Implemented |
NC0538 # 06 Y:2015 | 06 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,230 | $1,875 | Not Implemented |
NC0538 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $424 | $1,767 | Implemented |
NC0538 # 08 Y:2015 | 08 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,483 | $4,256 | Not Implemented |
IP0039 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,933 | $0 | Not Implemented |
IP0039 # 02 Y:2015 | 02 | 2015 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $6,224 | $853 | Not Implemented |
IP0039 # 03 Y:2015 | 03 | 2015 | INSTALL OCCUPANCY SENSORS | $330 | $128 | Not Implemented |
IP0039 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,314 | $1,524 | Not Implemented |
IP0039 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,262 | $3,790 | Not Implemented |
IP0039 # 06 Y:2015 | 06 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $6,679 | $6,839 | Not Implemented |
CO0700 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,900 | $1,270 | Implemented |
CO0700 # 02 Y:2015 | 02 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,710 | $0 | Not Implemented |
CO0700 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,950 | $82,280 | Not Implemented |
CO0700 # 04 Y:2015 | 04 | 2015 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $4,840 | $15,500 | Not Implemented |
CO0700 # 05 Y:2015 | 05 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $540 | $1,820 | Not Implemented |