IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

264

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0369 # 14 Y:2008 14 2008 INSULATE BARE EQUIPMENT $2,008 $1,241 Implemented
WV0369 # 15 Y:2008 15 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,004 $87 Not Implemented
WV0369 # 16 Y:2008 16 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,266 $114 Implemented
WV0369 # 17 Y:2008 17 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $835 $0 Implemented
WV0369 # 18 Y:2008 18 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $819 $1,484 Not Implemented
WV0369 # 19 Y:2008 19 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $563 $585 Implemented
WV0369 # 20 Y:2008 20 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $389 $470 Implemented
LE0254 # 01 Y:2007 01 2007 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $81,900 $65,000 Not Implemented
LE0254 # 02 Y:2007 02 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $67,570 $67,000 Not Implemented
LE0254 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,157 $20,000 Not Implemented
LE0254 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,686 $20,000 Implemented
LE0254 # 05 Y:2007 05 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $7,471 $800 Not Implemented
LE0254 # 06 Y:2007 06 2007 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $5,988 $3,000 Implemented
LE0254 # 07 Y:2007 07 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $3,029 $800 Not Implemented
WV0345 # 01 Y:2006 01 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $390,000 $140,000 n/a
WV0345 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $38,402 $8,000 Not Implemented
WV0345 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,574 $60,657 Implemented
WV0345 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,653 $26,300 Not Implemented
WV0345 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,346 $2,805 Implemented
WV0345 # 06 Y:2006 06 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $14,670 $1,000 Implemented
WV0345 # 07 Y:2006 07 2006 REDUCE VENTILATION AIR $10,829 $6,280 Not Implemented
WV0345 # 08 Y:2006 08 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,402 $1,000 Implemented
WV0345 # 09 Y:2006 09 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,834 $10,400 Not Implemented
WV0345 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,809 $49,405 Implemented
WV0345 # 11 Y:2006 11 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,570 $0 Not Implemented