IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,559

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0623 # 06 Y:2012 06 2012 OPTIMIZE PLANT POWER FACTOR $4,500 $8,160 Not Implemented
AM0623 # 07 Y:2012 07 2012 TREAT AND REUSE RINSE WATERS $3,300 $3,000 Not Implemented
AM0623 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $3,100 $570 Not Implemented
AM0623 # 09 Y:2012 09 2012 USE SYNTHETIC LUBRICANT $1,010 $0 Not Implemented
AM0621 # 01 Y:2012 01 2012 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $23,375 $50,000 Not Implemented
AM0621 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,750 $11,600 Implemented
AM0621 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,680 $1,000 Implemented
AM0621 # 04 Y:2012 04 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $220 $0 Not Implemented
UK1213 # 01 Y:2012 01 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,324 $0 Implemented
UK1213 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $14,754 $11,220 Not Implemented
UK1213 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,410 $26,824 Implemented
UK1213 # 04 Y:2012 04 2012 UPGRADE CONTROLS ON COMPRESSORS $4,375 $10,500 Not Implemented
UK1213 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $460 $756 Not Implemented
UK1213 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $350 $500 Not Implemented
UK1213 # 07 Y:2012 07 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $343 $269 Implemented
UK1213 # 08 Y:2012 08 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $654 $337 Implemented
UK1213 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $316 $327 Not Implemented
UK1213 # 10 Y:2012 10 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $49,180 $6,650 Not Implemented
UK1213 # 11 Y:2012 11 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,482 $988 Not Implemented
UK1213 # 12 Y:2012 12 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,563 $4,550 Implemented
UD0864 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,307 $2,925 Implemented
UD0864 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,307 $2,925 Implemented
UD0864 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,365 $2,650 Implemented
UD0864 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,365 $2,650 Implemented
UD0864 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $5,184 $0 Not Implemented