IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

285

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0050 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $4,041 $9,817 Implemented
NC0050 # 03 Y:1995 03 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,910 $15,000 Not Implemented
NC0050 # 04 Y:1995 04 1995 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $14,172 $35,000 Not Implemented
NC0050 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $291 $1,320 Implemented
NC0050 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,114 $300 Implemented
NC0050 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $680 $440 Not Implemented
NC0050 # 08 Y:1995 08 1995 USE A DIFFERENT OR RECYCLED RAW MATERIAL $678 $0 Not Implemented
NC0050 # 09 Y:1995 09 1995 USE LESS WASTEFUL PACKAGING $3,717 $0 Implemented
NC0049 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,182 $1,290 Implemented
NC0049 # 02 Y:1995 02 1995 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $13,275 $180,000 Not Implemented
NC0049 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,443 $8,000 Not Implemented
NC0049 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,293 $432 Not Implemented
NC0049 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $1,245 $3,600 Not Implemented
NC0049 # 06 Y:1995 06 1995 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,915 $2,000 Implemented
NC0049 # 07 Y:1995 07 1995 ADD AREA LIGHTING SWITCHES $478 $1,200 Not Implemented
NC0049 # 08 Y:1995 08 1995 REDUCE GLAZED AREAS IN BUILDINGS $5,285 $1,400 Implemented
NC0049 # 09 Y:1995 09 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,233 $4,000 Not Implemented
NC0049 # 10 Y:1995 10 1995 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $10,722 $2,115 Not Implemented
NC0028 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $153 $250 Implemented
NC0028 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,218 $600 Implemented
NC0028 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $787 $240 Not Implemented
NC0028 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $736 $1,510 Implemented
NC0028 # 05 Y:1994 05 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,525 $7,000 Not Implemented
TN0513 # 01 Y:1994 01 1994 INSTALL TIMERS AND/OR THERMOSTATS $7,632 $3,500 Not Implemented
TN0513 # 02 Y:1994 02 1994 CLOSE OFF UNNEEDED STEAM LINES $1,428 $0 Implemented