Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1996 |
Principal Product | Automotive relays |
NAICS | n/a |
SIC | 3625 - Relays And Industrial Controls |
Sales | $50,000,000-$100,000,000 |
# of Employees | 330 |
Plant Area (Sq.Ft.) | 88,900 |
Annual Production | 11,200,000 Pieces |
Production Hrs. Annual | 8,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $153,652 | 4,734,467 | kWh | $0.03 |
Electricity Demand | $116,182 | 10,103 | kW-months/year | $11.50 |
Natural Gas | $1,234 | 197 | MMBtu | $6.26 |
TOTAL ENERGY COSTS | $302,652 | |||
RECOMMENDED SAVINGS* | $56,049 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (haz) | Electricity Usage | Electricity Demand | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $1,822 Cost: $7,500 |
- | - | $1,822 | 475 | - | - |
- - kWh |
$1,822 475 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,237 Cost: $27,552 |
$8,297 | 268,464 | $4,940 | 430 | - | - |
$8,297 268,464 kWh |
$4,940 430 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $201 Cost: $40 |
$129 | 4,103 | $72 | 6 | - | - |
$129 4,103 kWh |
$72 6 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE |
Savings: $289 Cost: $10 |
$185 | 5,862 | $104 | 9 | - | - |
$185 5,862 kWh |
$104 9 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,927 Cost: $200 |
$1,237 | 40,152 | $690 | 60 | - | - |
$1,237 40,152 kWh |
$690 60 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,592 Cost: $390 |
$992 | 32,239 | $600 | 52 | - | - |
$992 32,239 kWh |
$600 52 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $5,397 Cost: $1,600 |
$866 | 28,136 | $4,531 | 394 | - | - |
$866 28,136 kWh |
$4,531 394 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $31,584 Cost: $66,000 |
- | - | - | - | $31,584 | 98,700 |
- - kWh |
- - kW-months/year |
$31,584 98,700 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $56,049 Cost: $103,292 |
$11,706 | 378,956 | $12,759 | 1,426 | $31,584 | 98,700 | $11,706 378,956 kWh |
$12,759 1,426 kW-months/year |
$31,584 98,700 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (haz) | Electricity Usage | Electricity Demand | Solid Waste (haz) |