IAC Assessment: NC0099
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0099
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1996
Principal Product Automotive relays
NAICS n/a
SIC 3625 - Relays And Industrial Controls
Sales $50,000,000-$100,000,000
# of Employees 330
Plant Area (Sq.Ft.) 88,900
Annual Production 11,200,000 Pieces
Production Hrs. Annual 8,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,652 4,734,467 kWh $0.03
Electricity Demand $116,182 10,103 kW-months/year $11.50
Natural Gas $1,234 197 MMBtu $6.26
TOTAL ENERGY COSTS $302,652
RECOMMENDED SAVINGS* $56,049 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Electricity Usage Electricity Demand Solid Waste (haz)
$ kWh $ kW-months/year $ lb
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,822
Cost:
$7,500
- - $1,822 475 - - -
-
kWh
$1,822
475
kW-months/year
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,237
Cost:
$27,552
$8,297 268,464 $4,940 430 - - $8,297
268,464
kWh
$4,940
430
kW-months/year
-
-
lb
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$201
Cost:
$40
$129 4,103 $72 6 - - $129
4,103
kWh
$72
6
kW-months/year
-
-
lb
04: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$289
Cost:
$10
$185 5,862 $104 9 - - $185
5,862
kWh
$104
9
kW-months/year
-
-
lb
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,927
Cost:
$200
$1,237 40,152 $690 60 - - $1,237
40,152
kWh
$690
60
kW-months/year
-
-
lb
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,592
Cost:
$390
$992 32,239 $600 52 - - $992
32,239
kWh
$600
52
kW-months/year
-
-
lb
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,397
Cost:
$1,600
$866 28,136 $4,531 394 - - $866
28,136
kWh
$4,531
394
kW-months/year
-
-
lb
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$31,584
Cost:
$66,000
- - - - $31,584 98,700 -
-
kWh
-
-
kW-months/year
$31,584
98,700
lb
TOTAL RECOMMENDED Savings:
$56,049
Cost:
$103,292
$11,706 378,956 $12,759 1,426 $31,584 98,700 $11,706
378,956
kWh
$12,759
1,426
kW-months/year
$31,584
98,700
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (haz) Electricity Usage Electricity Demand Solid Waste (haz)