IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0134 # 02 Y:2020 02 2020 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,687 $7,120 Not Implemented
BS0134 # 03 Y:2020 03 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,704 $1,017 Not Implemented
BS0134 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $1,507 $3,280 Not Implemented
BS0134 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $618 $405 Not Implemented
BS0134 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $760 $1,471 Not Implemented
BS0134 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,955 $12,790 Not Implemented
BS0066 # 08 Y:2015 08 2015 MINIMIZE WATER USAGE $702 $5,938 Not Implemented
BS0066 # 07 Y:2015 07 2015 OPTIMIZE PLANT POWER FACTOR $12,093 $25,245 Not Implemented
BS0066 # 06 Y:2015 06 2015 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $13,061 $19,065 Not Implemented
BS0066 # 05 Y:2015 05 2015 COMBINE UTILITY METERS $258 $253 Not Implemented
BS0066 # 04 Y:2015 04 2015 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,249 $80 Not Implemented
BS0066 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,219 $907 Not Implemented
BS0066 # 02 Y:2015 02 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,531 $26 Not Implemented
BS0066 # 01 Y:2015 01 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,458 $568 Not Implemented
BS0040 # 09 Y:2014 09 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $51 $119 Not Implemented
BS0040 # 08 Y:2014 08 2014 AIR CONDITION ONLY SPACE NECESSARY $122 $95 Not Implemented
BS0040 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $610 $360 Not Implemented
BS0040 # 06 Y:2014 06 2014 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $232 $221 Not Implemented
BS0040 # 05 Y:2014 05 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $316 $464 Not Implemented
BS0040 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $722 Implemented
BS0040 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $887 $2,075 Implemented
BS0040 # 02 Y:2014 02 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,977 $470 Not Implemented
BS0040 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,421 $2,496 Not Implemented