Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0134 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $760 | $1,471 | Not Implemented |
BS0134 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $618 | $405 | Not Implemented |
BS0134 # 04 Y:2020 | 04 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $1,507 | $3,280 | Not Implemented |
BS0134 # 03 Y:2020 | 03 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,704 | $1,017 | Not Implemented |
BS0134 # 02 Y:2020 | 02 | 2020 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $2,687 | $7,120 | Not Implemented |
BS0134 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,955 | $12,790 | Not Implemented |
BS0066 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,219 | $907 | Not Implemented |
BS0066 # 08 Y:2015 | 08 | 2015 | MINIMIZE WATER USAGE | $702 | $5,938 | Not Implemented |
BS0066 # 07 Y:2015 | 07 | 2015 | OPTIMIZE PLANT POWER FACTOR | $12,093 | $25,245 | Not Implemented |
BS0066 # 06 Y:2015 | 06 | 2015 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $13,061 | $19,065 | Not Implemented |
BS0066 # 05 Y:2015 | 05 | 2015 | COMBINE UTILITY METERS | $258 | $253 | Not Implemented |
BS0066 # 04 Y:2015 | 04 | 2015 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,249 | $80 | Not Implemented |
BS0066 # 02 Y:2015 | 02 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,531 | $26 | Not Implemented |
BS0066 # 01 Y:2015 | 01 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,458 | $568 | Not Implemented |
BS0040 # 01 Y:2014 | 01 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,421 | $2,496 | Not Implemented |
BS0040 # 09 Y:2014 | 09 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $51 | $119 | Not Implemented |
BS0040 # 08 Y:2014 | 08 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $122 | $95 | Not Implemented |
BS0040 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $610 | $360 | Not Implemented |
BS0040 # 06 Y:2014 | 06 | 2014 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $232 | $221 | Not Implemented |
BS0040 # 05 Y:2014 | 05 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $316 | $464 | Not Implemented |
BS0040 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $500 | $722 | Implemented |
BS0040 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $887 | $2,075 | Implemented |
BS0040 # 02 Y:2014 | 02 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,977 | $470 | Not Implemented |