Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Boise State University |
---|---|
Assessment Year | 2014 |
Principal Product | Industrial Electronics |
NAICS | 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3672 - Printed Circuit Boards |
Sales | $10,000,000-$50,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 21,000 |
Annual Production | 15,000 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | ID |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $38,847 | 628,640 | kWh | $0.06 |
Electricity Demand | $13,290 | 2,486 | kW-months/year | $5.35 |
Natural Gas | $4,116 | 464 | MMBtu | $8.87 |
TOTAL ENERGY COSTS | $56,254 | |||
RECOMMENDED SAVINGS* | $12,116 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,387 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $5,421 Cost: $2,496 |
$5,421 | 87,441 | - | - | - | - | - | - |
$5,421 87,441 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $3,977 Cost: $470 |
- | - | $3,977 | 744 | - | - | - | - |
- - kWh |
$3,977 744 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $887 Cost: $2,075 |
$691 | 11,141 | $117 | 22 | - | - | $79 | - |
$691 11,141 kWh |
$117 22 kW-months/year |
- - MMBtu |
$79 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $500 Cost: $722 |
$500 | 8,065 | - | - | - | - | - | - |
$500 8,065 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $316 Cost: $464 |
- | - | - | - | $316 | 36 | - | - |
- - kWh |
- - kW-months/year |
$316 36 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION |
Savings: $232 Cost: $221 |
$170 | 2,745 | - | - | $62 | 7 | - | - |
$170 2,745 kWh |
- - kW-months/year |
$62 7 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $610 Cost: $360 |
$547 | 8,817 | - | - | - | - | $63 | - |
$547 8,817 kWh |
- - kW-months/year |
- - MMBtu |
$63 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $122 Cost: $95 |
$8 | 132 | - | - | $114 | 13 | - | - |
$8 132 kWh |
- - kW-months/year |
$114 13 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $51 Cost: $119 |
$51 | 830 | - | - | - | - | - | - |
$51 830 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,116 Cost: $7,022 |
$7,388 | 119,171 | $4,094 | 766 | $492 | 55 | $142 | - | $7,388 119,171 kWh |
$4,094 766 kW-months/year |
$492 55 MMBtu |
$142 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,387 Cost: $2,797 |
$1,191 | 19,206 | $117 | 22 | - | - | $79 | - | $1,191 19,206 kWh |
$117 22 kW-months/year |
- - MMBtu |
$79 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost |