Select a Center

Arizona State University
Boise State University
Case Western Reserve University
Clemson University
Colorado State University
Georgia Institute of Technology
Indiana University-Purdue University
Lehigh University
Louisiana State University
North Carolina State
Oklahoma State University
Oregon State University
San Diego State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Kentucky
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of Texas Rio Grande Valley
University of Utah
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
IAC Assessment: BS0040
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: BS0040
Due to University and State restrictions, IAC assessment activities at your local center may be on hold.
Contact your local center for more details on operating status and available services.

Click here for details about Coronavirus (COVID-19) Recovery Support programs
IAC Center Boise State University
Assessment Year 2014
Principal Product Industrial Electronics
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $10,000,000
# of Employees 90
Plant Area (Sq.Ft.) 21,000
Annual Production 15,000 Pieces
Production Hrs. Annual 2,080
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,847 628,640 kWh $0.06
Electricity Demand $13,290 2,486 kW-months/year $5.35
Natural Gas $4,116 464 MMBtu $8.87
TOTAL ENERGY COSTS $56,254
RECOMMENDED SAVINGS* $12,116 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,387
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,421
Cost:
$2,496
$5,421 87,441 - - - - - - $5,421
87,441
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,977
Cost:
$470
- - $3,977 744 - - - - -
-
kWh
$3,977
744
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$887
Cost:
$2,075
$691 11,141 $117 22 - - $79 - $691
11,141
kWh
$117
22
kW-months/year
-
-
MMBtu
$79
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$500
Cost:
$722
$500 8,065 - - - - - - $500
8,065
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$316
Cost:
$464
- - - - $316 36 - - -
-
kWh
-
-
kW-months/year
$316
36
MMBtu
-
-
$
06: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION Savings:
$232
Cost:
$221
$170 2,745 - - $62 7 - - $170
2,745
kWh
-
-
kW-months/year
$62
7
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$610
Cost:
$360
$547 8,817 - - - - $63 - $547
8,817
kWh
-
-
kW-months/year
-
-
MMBtu
$63
-
$
08: 2.7223 CONDITION SMALLEST SPACE NECESSARY Savings:
$122
Cost:
$95
$8 132 - - $114 13 - - $8
132
kWh
-
-
kW-months/year
$114
13
MMBtu
-
-
$
09: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$51
Cost:
$119
$51 830 - - - - - - $51
830
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$12,116
Cost:
$7,022
$7,388 119,171 $4,094 766 $492 55 $142 - $7,388
119,171
kWh
$4,094
766
kW-months/year
$492
55
MMBtu
$142
-
$
TOTAL IMPLEMENTED Savings:
$1,387
Cost:
$2,797
$1,191 19,206 $117 22 - - $79 - $1,191
19,206
kWh
$117
22
kW-months/year
-
-
MMBtu
$79
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost