IAC logo
IAC Assessment: BS0040
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0040
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2014
Principal Product Industrial Electronics
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 21,000
Annual Production 15,000 Pieces
Production Hrs. Annual 2,080
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,847 628,640 kWh $0.06
Electricity Demand $13,290 2,486 kW-months/year $5.35
Natural Gas $4,116 464 MMBtu $8.87
TOTAL ENERGY COSTS $56,254
RECOMMENDED SAVINGS* $12,116 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,387
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,421
Cost:
$2,496
$5,421 87,441 - - - - - - $5,421
87,441
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,977
Cost:
$470
- - $3,977 744 - - - - -
-
kWh
$3,977
744
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$887
Cost:
$2,075
$691 11,141 $117 22 - - $79 - $691
11,141
kWh
$117
22
kW-months/year
-
-
MMBtu
$79
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$500
Cost:
$722
$500 8,065 - - - - - - $500
8,065
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$316
Cost:
$464
- - - - $316 36 - - -
-
kWh
-
-
kW-months/year
$316
36
MMBtu
-
-
$
06: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION Savings:
$232
Cost:
$221
$170 2,745 - - $62 7 - - $170
2,745
kWh
-
-
kW-months/year
$62
7
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$610
Cost:
$360
$547 8,817 - - - - $63 - $547
8,817
kWh
-
-
kW-months/year
-
-
MMBtu
$63
-
$
08: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$122
Cost:
$95
$8 132 - - $114 13 - - $8
132
kWh
-
-
kW-months/year
$114
13
MMBtu
-
-
$
09: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$51
Cost:
$119
$51 830 - - - - - - $51
830
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$12,116
Cost:
$7,022
$7,388 119,171 $4,094 766 $492 55 $142 - $7,388
119,171
kWh
$4,094
766
kW-months/year
$492
55
MMBtu
$142
-
$
TOTAL IMPLEMENTED Savings:
$1,387
Cost:
$2,797
$1,191 19,206 $117 22 - - $79 - $1,191
19,206
kWh
$117
22
kW-months/year
-
-
MMBtu
$79
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost