Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
103
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0018 # 04 Y:2007 | 04 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,001 | $2,500 | Not Implemented |
MZ0018 # 05 Y:2007 | 05 | 2007 | REDESIGN PROCESS | $5,616 | $0 | Not Implemented |
MZ0018 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,872 | $0 | Not Implemented |
MZ0018 # 03 Y:2007 | 03 | 2007 | INSTALL OCCUPANCY SENSORS | $3,576 | $2,450 | Not Implemented |
MZ0018 # 01 Y:2007 | 01 | 2007 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $25,600 | $0 | Not Implemented |
MA0624 # 02 Y:2007 | 02 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $47,607 | $22,000 | Not Implemented |
MA0624 # 05 Y:2007 | 05 | 2007 | IMPROVE COMBUSTION CONTROL CAPABILITY | $12,255 | $75,000 | Implemented |
MA0624 # 04 Y:2007 | 04 | 2007 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $14,298 | $11,500 | Implemented |
MA0624 # 03 Y:2007 | 03 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $24,012 | $50,000 | Implemented |
MA0624 # 08 Y:2007 | 08 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,655 | $4,000 | Implemented |
MA0624 # 06 Y:2007 | 06 | 2007 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,448 | $2,500 | Implemented |
MA0624 # 10 Y:2007 | 10 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,007 | $12,000 | Implemented |
MA0624 # 11 Y:2007 | 11 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,570 | $15,700 | Not Implemented |
MA0624 # 12 Y:2007 | 12 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,045 | $5,670 | Implemented |
MA0624 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,741 | $0 | Implemented |
MA0624 # 09 Y:2007 | 09 | 2007 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,605 | $1,000 | Not Implemented |
MA0624 # 01 Y:2007 | 01 | 2007 | REPAIR OR REPLACE STEAM TRAPS | $62,300 | $24,500 | Implemented |
AM0534 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,500 | $20 | Implemented |
AM0534 # 08 Y:2007 | 08 | 2007 | USE SYNTHETIC LUBRICANT | $320 | $0 | Implemented |
AM0534 # 07 Y:2007 | 07 | 2007 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,150 | $0 | Not Implemented |
AM0534 # 06 Y:2007 | 06 | 2007 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,370 | $0 | Implemented |
AM0534 # 05 Y:2007 | 05 | 2007 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $1,560 | $0 | Implemented |
AM0534 # 04 Y:2007 | 04 | 2007 | COVER OPEN TANKS | $2,500 | $0 | Implemented |
AM0534 # 03 Y:2007 | 03 | 2007 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $7,200 | $2,000 | Implemented |
AM0534 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,500 | $1,500 | Implemented |