Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
120
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0070 # 02 Y:2011 | 02 | 2011 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $549 | $845 | Not Implemented |
UA0070 # 01 Y:2011 | 01 | 2011 | DISCONNECT BALLASTS | $47,591 | $5,500 | Not Implemented |
UA0070 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,386 | $2,900 | Not Implemented |
UA0070 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,557 | $80 | Not Implemented |
UA0070 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,086 | $15,744 | Not Implemented |
GT0887 # 06 Y:2011 | 06 | 2011 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $17,230 | $0 | Not Implemented |
GT0887 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,716 | $2,500 | Implemented |
GT0887 # 04 Y:2011 | 04 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,327 | $0 | Not Implemented |
GT0887 # 03 Y:2011 | 03 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,160 | $5,000 | Not Implemented |
GT0887 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,870 | $41,828 | Not Implemented |
GT0887 # 01 Y:2011 | 01 | 2011 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $44,987 | $50,000 | Not Implemented |
UF0450 # 01 Y:2011 | 01 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,683 | $0 | Not Implemented |
UF0450 # 04 Y:2011 | 04 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,110 | $0 | Not Implemented |
UF0450 # 10 Y:2011 | 10 | 2011 | AIR CONDITION ONLY SPACE NECESSARY | $204 | $17 | Not Implemented |
UF0450 # 09 Y:2011 | 09 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,074 | $3,066 | Not Implemented |
UF0450 # 06 Y:2011 | 06 | 2011 | USE COMPRESSOR AIR FILTERS | $2,246 | $270 | Not Implemented |
UF0450 # 08 Y:2011 | 08 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,431 | $0 | Not Implemented |
UF0450 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,667 | $470 | Not Implemented |
UF0450 # 02 Y:2011 | 02 | 2011 | INSTALL COMMON HEADER ON COMPRESSORS | $1,378 | $511 | Not Implemented |
UF0450 # 11 Y:2011 | 11 | 2011 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,406 | $109 | Not Implemented |
UF0450 # 05 Y:2011 | 05 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $24,031 | $0 | Not Implemented |
UF0450 # 07 Y:2011 | 07 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,013 | $5,903 | Not Implemented |
LE0328 # 03 Y:2011 | 03 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,853 | $18,000 | Implemented |
LE0328 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,650 | $3,000 | Implemented |
LE0328 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,435 | $12,420 | Implemented |