Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
352
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2509 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $19,546 | $32,370 | n/a |
UC2509 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,269 | $1,190 | n/a |
UC2509 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,692 | $9,100 | n/a |
UC2509 # 09 Y:2024 | 09 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $13,478 | $50 | n/a |
UC2509 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,936 | $100 | n/a |
UC2509 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $8,347 | $2,798 | n/a |
UC2509 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $28,237 | $0 | n/a |
UC2509 # 05 Y:2024 | 05 | 2024 | REPLACE BOILER | $42,258 | $132,297 | n/a |
UC2509 # 02 Y:2024 | 02 | 2024 | PAY UTILITY BILLS ON TIME | $114 | $0 | n/a |
UC2505 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,529 | $63,000 | n/a |
UC2505 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,106 | $495,624 | n/a |
UC2505 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,438 | $75 | n/a |
UC2505 # 01 Y:2024 | 01 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,475 | $1,500 | n/a |
UC2505 # 08 Y:2024 | 08 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,963 | $0 | n/a |
UC2505 # 03 Y:2024 | 03 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $4,253 | $2,096 | n/a |
UC2505 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,138 | $1,140 | n/a |
UC2505 # 09 Y:2024 | 09 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,294 | $852 | n/a |
UC2505 # 04 Y:2024 | 04 | 2024 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $39,288 | $50,000 | n/a |
UC2503 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,078 | $1,600 | n/a |
UC2503 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,369 | $18,244 | n/a |
UC2503 # 01 Y:2024 | 01 | 2024 | PAY UTILITY BILLS ON TIME | $115 | $0 | n/a |
UC2503 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,774 | $0 | n/a |
UC2503 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $751 | $435 | n/a |
UC2503 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $531 | $2,870 | n/a |
UC2503 # 06 Y:2024 | 06 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,917 | $51,000 | n/a |