Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
157
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0261 # 06 Y:2025 | 06 | 2025 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,283 | $1,200 | n/a |
DL0261 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,186 | $16,400 | n/a |
DL0261 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,337 | $90,000 | n/a |
DL0261 # 03 Y:2025 | 03 | 2025 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,021 | $7,950 | n/a |
DL0261 # 02 Y:2025 | 02 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,374 | $0 | n/a |
DL0261 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,489 | $720 | n/a |
OK1152 # 02 Y:2025 | 02 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,879 | $2,304 | n/a |
OK1152 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,737 | $16,196 | n/a |
OK1152 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,701 | $9,073 | n/a |
OK1152 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,453 | $208,600 | n/a |
OK1152 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,801 | $0 | n/a |
OK1152 # 09 Y:2025 | 09 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,238 | $0 | n/a |
OK1152 # 03 Y:2025 | 03 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,965 | $0 | n/a |
OK1152 # 04 Y:2025 | 04 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,489 | $20,639 | n/a |
OK1152 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,424 | $13,000 | n/a |
NT0048 # 03 Y:2025 | 03 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $998 | $1,346 | n/a |
NT0048 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,633 | $5,609 | n/a |
NT0048 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,312 | $55,710 | n/a |
NT0048 # 06 Y:2025 | 06 | 2025 | OPTIMIZE PLANT POWER FACTOR | $7,122 | $25,622 | n/a |
NT0048 # 07 Y:2025 | 07 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $321,458 | $5,000 | n/a |
NT0048 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,298 | $0 | n/a |
NT0048 # 04 Y:2025 | 04 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $13,913 | $73,500 | n/a |
WV0686 # 03 Y:2025 | 03 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,393 | $9,261 | n/a |
WV0686 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,920 | $1,550 | n/a |
WV0686 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $247 | $108 | n/a |