IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 361 Electric Distribution Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0104 # 04 Y:2013 04 2013 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $18,300 $100 Not Implemented
DL0104 # 16 Y:2013 16 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $22,505 $10,700 Not Implemented
DL0104 # 15 Y:2013 15 2013 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $18,800 $45,000 Not Implemented
DL0104 # 14 Y:2013 14 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $29,700 $1,320 Not Implemented
DL0104 # 13 Y:2013 13 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $10,200 $3,800 Not Implemented
DL0104 # 12 Y:2013 12 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,500 $31,050 Not Implemented
DL0104 # 11 Y:2013 11 2013 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $48,100 $50,000 Not Implemented
DL0104 # 10 Y:2013 10 2013 MINIMIZE WATER USAGE $5,100 $280 Not Implemented
DL0104 # 09 Y:2013 09 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $30,500 $700 Not Implemented
DL0104 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,300 $9,570 Not Implemented
DL0104 # 07 Y:2013 07 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,800 $100 Not Implemented
DL0104 # 06 Y:2013 06 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,500 $100 Not Implemented
DL0104 # 05 Y:2013 05 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,600 $100 Not Implemented
DL0104 # 03 Y:2013 03 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $39,500 $1,000 Not Implemented
DL0104 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN WATER LINES AND VALVES $20,500 $780 Not Implemented
DL0104 # 01 Y:2013 01 2013 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $31,000 $510 Not Implemented
DL0104 # 17 Y:2013 17 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,800 $37,400 Not Implemented
DL0104 # 18 Y:2013 18 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,900 $45,000 Not Implemented
DL0104 # 19 Y:2013 19 2013 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $19,700 $100 Not Implemented
RU0162 # 01 Y:1992 01 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $90 $750 Implemented
RU0162 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,196 $2,500 Not Implemented
RU0162 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $104 $24 Implemented
RU0162 # 02 Y:1992 02 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11 $31 Not Implemented
RU0162 # 04 Y:1992 04 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $477 $1,080 Implemented
RU0162 # 06 Y:1992 06 1992 USE RADIANT HEATER FOR SPOT HEATING $8,910 $10,500 Implemented