IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 361 Electric Distribution Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0848 # 10 Y:2012 10 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $834 $600 Not Implemented
UD0848 # 03 Y:2012 03 2012 MINIMIZE WATER USAGE $1,496 $1,000 Not Implemented
UD0848 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $6,519 $5,000 Implemented
UD0848 # 01 Y:2012 01 2012 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $550 $1,000 Not Implemented
UD0848 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,458 $0 Not Implemented
UD0848 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $239 $0 Not Implemented
UD0848 # 06 Y:2012 06 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,962 $1,000 Not Implemented
UD0848 # 07 Y:2012 07 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,543 $0 Implemented
UD0848 # 08 Y:2012 08 2012 RECOVER WASTE HEAT FROM EQUIPMENT $2,209 $1,000 Not Implemented
UD0848 # 09 Y:2012 09 2012 REDUCE VENTILATION AIR $882 $300 Implemented
UD0251 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $882 $300 Implemented
UD0251 # 06 Y:1988 06 1988 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $311 $500 Not Implemented
UD0251 # 04 Y:1988 04 1988 REDESIGN PROCESS $2,282 $1,500 Not Implemented
UD0251 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,853 $16,000 Not Implemented
UD0251 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,275 $0 Implemented
UD0251 # 01 Y:1988 01 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,500 $15,000 Implemented
UD0137 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $809 $1,894 Not Implemented
UD0137 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $6,700 $3,000 Implemented
UD0085 # 02 Y:1983 02 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,015 $200 Not Implemented
UD0085 # 03 Y:1983 03 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,059 $12,000 Not Implemented
UD0085 # 01 Y:1983 01 1983 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $142 $0 Not Implemented
UD0049 # 05 Y:1982 05 1982 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $7,008 $7,500 Implemented
UD0049 # 04 Y:1982 04 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $14,665 $163,485 Implemented
UD0049 # 03 Y:1982 03 1982 REDUCE GLAZED AREAS IN BUILDINGS $28,537 $40,346 Implemented
UD0049 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $773 $0 Implemented