Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1988 |
Principal Product | POWER SYSTEMS |
NAICS | n/a |
SIC | 3612 - Transformers, Except Electronic |
Sales | $10,000,000-$50,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 700 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $116,798 | 1,818,875 | kWh | $0.06 |
Natural Gas | $4,749 | 839 | MMBtu | $5.66 |
TOTAL ENERGY COSTS | $121,547 | |||
RECOMMENDED SAVINGS* | $24,103 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,657 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $9,500 Cost: $15,000 |
$10,332 | - | - | - | $(-832) | - |
$10,332 - kWh |
- - MMBtu |
$(-832) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $7,275 Cost: - |
$7,275 | - | - | - | - | - |
$7,275 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,853 Cost: $16,000 |
$5,407 | 62,134 | $(-1,554) | (-283) | - | - |
$5,407 62,134 kWh |
$(-1,554) (-283) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.5194 REDESIGN PROCESS |
Savings: $2,282 Cost: $1,500 |
$2,454 | 27,550 | $(-172) | (-31) | - | - |
$2,454 27,550 kWh |
$(-172) (-31) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $882 Cost: $300 |
$922 | 12,603 | $(-40) | (-7) | - | - |
$922 12,603 kWh |
$(-40) (-7) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6224 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS |
Savings: $311 Cost: $500 |
$311 | 4,982 | - | - | - | - |
$311 4,982 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $24,103 Cost: $33,300 |
$26,701 | 107,269 | $(-1,766) | (-321) | $(-832) | - | $26,701 107,269 kWh |
$(-1,766) (-321) MMBtu |
$(-832) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,657 Cost: $15,300 |
$18,529 | 12,603 | $(-40) | (-7) | $(-832) | - | $18,529 12,603 kWh |
$(-40) (-7) MMBtu |
$(-832) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |