IAC logo
IAC Assessment: UD0251
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0251
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1988
Principal Product POWER SYSTEMS
NAICS n/a
SIC 3612 - Transformers, Except Electronic
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 700 Pieces
Production Hrs. Annual 2,080
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,798 1,818,875 kWh $0.06
Natural Gas $4,749 839 MMBtu $5.66
TOTAL ENERGY COSTS $121,547
RECOMMENDED SAVINGS* $24,103 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,657
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$9,500
Cost:
$15,000
$10,332 - - - $(-832) - $10,332
-
kWh
-
-
MMBtu
$(-832)
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,275
Cost:
-
$7,275 - - - - - $7,275
-
kWh
-
-
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,853
Cost:
$16,000
$5,407 62,134 $(-1,554) (-283) - - $5,407
62,134
kWh
$(-1,554)
(-283)
MMBtu
-
-
$
04: 2.5194 REDESIGN PROCESS Savings:
$2,282
Cost:
$1,500
$2,454 27,550 $(-172) (-31) - - $2,454
27,550
kWh
$(-172)
(-31)
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$882
Cost:
$300
$922 12,603 $(-40) (-7) - - $922
12,603
kWh
$(-40)
(-7)
MMBtu
-
-
$
06: 2.6224 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS Savings:
$311
Cost:
$500
$311 4,982 - - - - $311
4,982
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$24,103
Cost:
$33,300
$26,701 107,269 $(-1,766) (-321) $(-832) - $26,701
107,269
kWh
$(-1,766)
(-321)
MMBtu
$(-832)
-
$
TOTAL IMPLEMENTED Savings:
$17,657
Cost:
$15,300
$18,529 12,603 $(-40) (-7) $(-832) - $18,529
12,603
kWh
$(-40)
(-7)
MMBtu
$(-832)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes