IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

739

matching recommendations
Reset
SIC 361 Electric Distribution Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0378 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $17,355 $7,450 Not Implemented
NC0378 # 06 Y:2008 06 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,591 $7,700 Implemented
NC0378 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,481 $100 Implemented
NC0378 # 08 Y:2008 08 2008 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $226,587 $37,500 Implemented
NC0378 # 09 Y:2008 09 2008 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $10,000 $1,000 Implemented
NC0378 # 10 Y:2008 10 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $32,100 $100,000 Not Implemented
NC0378 # 11 Y:2008 11 2008 USE PHOTOCELL CONTROLS $3,452 $12,000 Implemented
UA0023 # 01 Y:2008 01 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,336 $3,900 Implemented
UA0023 # 02 Y:2008 02 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $76 $325 Not Implemented
UA0023 # 03 Y:2008 03 2008 UPGRADE OBSOLETE EQUIPMENT $35,422 $4,000 Implemented
UA0023 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $110 $272 Implemented
UA0023 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $557 $1,000 Implemented
UA0023 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $896 $0 Not Implemented
UA0023 # 07 Y:2008 07 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $900 $1,552 Implemented
UA0023 # 08 Y:2008 08 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,578 $1,570 Implemented
TT0020 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,980 $5,000 Not Implemented
TT0020 # 02 Y:2008 02 2008 USE UTILITY CONTROLLED POWER MANAGEMENT $18,637 $5,000 Implemented
TT0020 # 03 Y:2008 03 2008 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,062 $1,000 Not Implemented
TT0020 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,400 $2,900 Implemented
TT0020 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,320 $3,300 Implemented
UF0410 # 01 Y:2008 01 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,868 $27,216 Not Implemented
UF0410 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,023 $19,505 Not Implemented
UF0410 # 03 Y:2008 03 2008 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,665 $459 Implemented
UF0410 # 04 Y:2008 04 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,229 $233 Implemented
UF0410 # 05 Y:2008 05 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,494 $0 Implemented