IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 361 Electric Distribution Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0926 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,597 $57,656 Implemented
GT0926 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $27,641 $60,000 Not Implemented
GT0926 # 03 Y:2019 03 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $22,517 $565,692 Not Implemented
GT0926 # 04 Y:2019 04 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $131,732 $1,140,000 Not Implemented
GT0856 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,329 $80,207 Implemented
GT0856 # 07 Y:2008 07 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,385 $13,000 Not Implemented
GT0856 # 06 Y:2008 06 2008 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $8,400 $15,000 Not Implemented
GT0856 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,723 $0 Implemented
GT0856 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,097 $4,500 Implemented
GT0856 # 03 Y:2008 03 2008 INSTALL TIMERS AND/OR THERMOSTATS $8,620 $3,000 Not Implemented
GT0856 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $9,290 $2,000 Implemented
GT0856 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $11,537 $2,000 Implemented
GT0799 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,582 $3,682 Implemented
GT0799 # 06 Y:2005 06 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,500 $60,000 Implemented
GT0799 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $29,409 $260,000 Not Implemented
GT0799 # 04 Y:2005 04 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,608 $12,000 Not Implemented
GT0799 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,040 $280,000 Not Implemented
GT0799 # 01 Y:2005 01 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,890 $450 Not Implemented
GT0610 # 04 Y:1997 04 1997 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,510 $15,700 Not Implemented
GT0610 # 05 Y:1997 05 1997 MOVE PRODUCT USING MECHANICAL MEANS $13,890 $12,000 Implemented
GT0610 # 06 Y:1997 06 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $45,100 $8,000 Implemented
GT0610 # 07 Y:1997 07 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,530 $4,350 Not Implemented
GT0610 # 08 Y:1997 08 1997 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $7,016 $10,120 Not Implemented
GT0610 # 03 Y:1997 03 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,319 $510 Not Implemented
GT0610 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,580 $500 Implemented