Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsSIC | 3613 | Switchgear And Switchboard Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0020 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,320 | $3,300 | Implemented |
TT0020 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,400 | $2,900 | Implemented |
TT0020 # 02 Y:2008 | 02 | 2008 | USE UTILITY CONTROLLED POWER MANAGEMENT | $18,637 | $5,000 | Implemented |
TN0651 # 04 Y:1999 | 04 | 1999 | INSULATE BARE EQUIPMENT | $3,020 | $1,605 | Implemented |
TN0651 # 02 Y:1999 | 02 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $9,040 | $9,140 | Implemented |
TN0329 # 07 Y:1988 | 07 | 1988 | IMPROVE LUBRICATION PRACTICES | $1,824 | $0 | Implemented |
TN0329 # 12 Y:1988 | 12 | 1988 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $179 | $600 | Implemented |
TN0329 # 10 Y:1988 | 10 | 1988 | COVER OPEN TANKS | $252 | $0 | Implemented |
TN0329 # 09 Y:1988 | 09 | 1988 | INSULATE BARE EQUIPMENT | $1,106 | $146 | Implemented |
TN0329 # 06 Y:1988 | 06 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,824 | $1,180 | Implemented |
TN0329 # 05 Y:1988 | 05 | 1988 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,783 | $3,300 | Implemented |
TN0329 # 04 Y:1988 | 04 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,619 | $0 | Implemented |
TN0329 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,753 | $615 | Implemented |
TN0329 # 02 Y:1988 | 02 | 1988 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,471 | $2,193 | Implemented |
TN0308 # 04 Y:1987 | 04 | 1987 | INSULATE BARE EQUIPMENT | $603 | $1,440 | Implemented |
TN0308 # 07 Y:1987 | 07 | 1987 | OPTIMIZE PLANT POWER FACTOR | $1,764 | $6,800 | Implemented |
TN0308 # 06 Y:1987 | 06 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $950 | $470 | Implemented |
TN0308 # 05 Y:1987 | 05 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,709 | $165 | Implemented |