IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

386

matching recommendations
Reset
SIC 3613 Switchgear And Switchboard Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0236 # 03 Y:1987 03 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $241 $80 Implemented
OK0236 # 04 Y:1987 04 1987 INSTALL TIMERS AND/OR THERMOSTATS $2,644 $3,300 Implemented
OK0236 # 05 Y:1987 05 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $283 $0 Implemented
OK0236 # 06 Y:1987 06 1987 COMBINE UTILITY METERS $768 $520 Implemented
OK0236 # 07 Y:1987 07 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,280 $820 Implemented
WI0004 # 04 Y:1987 04 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,838 $13,000 Not Implemented
WI0004 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,551 $549 Implemented
WI0004 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $224 $0 Not Implemented
WI0004 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $448 $0 Implemented
WI0004 # 05 Y:1987 05 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $282 $842 Not Implemented
WI0004 # 06 Y:1987 06 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $927 $2,100 Implemented
TN0308 # 01 Y:1987 01 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,834 $0 Not Implemented
TN0308 # 02 Y:1987 02 1987 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,468 $16,872 Not Implemented
TN0308 # 03 Y:1987 03 1987 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $2,858 $3,500 Not Implemented
TN0308 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $603 $1,440 Implemented
TN0308 # 05 Y:1987 05 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,709 $165 Implemented
TN0308 # 06 Y:1987 06 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $950 $470 Implemented
TN0308 # 07 Y:1987 07 1987 OPTIMIZE PLANT POWER FACTOR $1,764 $6,800 Implemented
OK0175 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $678 $1,252 Implemented
OK0175 # 02 Y:1985 02 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,344 $3,461 Not Implemented
OK0175 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $748 $400 Implemented
OK0175 # 04 Y:1985 04 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,056 $330 Not Implemented
OK0175 # 05 Y:1985 05 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,954 $4,000 Implemented
OK0175 # 06 Y:1985 06 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,146 $35,020 Not Implemented
TN0221 # 01 Y:1984 01 1984 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $4,406 $7,000 Not Implemented