Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
386
matching recommendationsSIC | 3613 | Switchgear And Switchboard Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0621 # 10 Y:2022 | 10 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $601 | $98 | Implemented |
WV0621 # 11 Y:2022 | 11 | 2022 | OPTIMIZE PLANT POWER FACTOR | $596 | $2,747 | Implemented |
WV0621 # 12 Y:2022 | 12 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $582 | $1,321 | Not Implemented |
WV0621 # 13 Y:2022 | 13 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $412 | $1,761 | Implemented |
TR0009 # 06 Y:2018 | 06 | 2018 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,315 | $14,000 | Implemented |
TR0009 # 05 Y:2018 | 05 | 2018 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $17,718 | $3,748 | Not Implemented |
TR0009 # 04 Y:2018 | 04 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,987 | $15,373 | Implemented |
TR0009 # 03 Y:2018 | 03 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $814 | $0 | Not Implemented |
TR0009 # 01 Y:2018 | 01 | 2018 | OPTIMIZE PLANT POWER FACTOR | $3,043 | $12,500 | Not Implemented |
TR0009 # 02 Y:2018 | 02 | 2018 | RECYCLE FLUORESCENT LAMPS | $6,608 | $13,260 | Implemented |
BD0488 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,086 | $45,630 | n/a |
BD0488 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $4,187 | $600 | n/a |
BD0488 # 03 Y:2016 | 03 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,115 | $3,770 | n/a |
BD0488 # 04 Y:2016 | 04 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,615 | $1,500 | n/a |
BD0488 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $581 | $425 | n/a |
BD0488 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $236 | $800 | n/a |
DL0104 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $20,500 | $780 | Not Implemented |
DL0104 # 19 Y:2013 | 19 | 2013 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $19,700 | $100 | Not Implemented |
DL0104 # 18 Y:2013 | 18 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,900 | $45,000 | Not Implemented |
DL0104 # 17 Y:2013 | 17 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,800 | $37,400 | Not Implemented |
DL0104 # 15 Y:2013 | 15 | 2013 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $18,800 | $45,000 | Not Implemented |
DL0104 # 14 Y:2013 | 14 | 2013 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $29,700 | $1,320 | Not Implemented |
DL0104 # 13 Y:2013 | 13 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,200 | $3,800 | Not Implemented |
DL0104 # 12 Y:2013 | 12 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $15,500 | $31,050 | Not Implemented |
DL0104 # 11 Y:2013 | 11 | 2013 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $48,100 | $50,000 | Not Implemented |