IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

386

matching recommendations
Reset
SIC 3613 Switchgear And Switchboard Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0621 # 10 Y:2022 10 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $601 $98 Implemented
WV0621 # 11 Y:2022 11 2022 OPTIMIZE PLANT POWER FACTOR $596 $2,747 Implemented
WV0621 # 12 Y:2022 12 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $582 $1,321 Not Implemented
WV0621 # 13 Y:2022 13 2022 DEVELOP A REPAIR/REPLACE POLICY $412 $1,761 Implemented
TR0009 # 06 Y:2018 06 2018 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,315 $14,000 Implemented
TR0009 # 05 Y:2018 05 2018 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $17,718 $3,748 Not Implemented
TR0009 # 04 Y:2018 04 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,987 $15,373 Implemented
TR0009 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $814 $0 Not Implemented
TR0009 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $3,043 $12,500 Not Implemented
TR0009 # 02 Y:2018 02 2018 RECYCLE FLUORESCENT LAMPS $6,608 $13,260 Implemented
BD0488 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,086 $45,630 n/a
BD0488 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $4,187 $600 n/a
BD0488 # 03 Y:2016 03 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,115 $3,770 n/a
BD0488 # 04 Y:2016 04 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,615 $1,500 n/a
BD0488 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $581 $425 n/a
BD0488 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $236 $800 n/a
DL0104 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN WATER LINES AND VALVES $20,500 $780 Not Implemented
DL0104 # 19 Y:2013 19 2013 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $19,700 $100 Not Implemented
DL0104 # 18 Y:2013 18 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,900 $45,000 Not Implemented
DL0104 # 17 Y:2013 17 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,800 $37,400 Not Implemented
DL0104 # 15 Y:2013 15 2013 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $18,800 $45,000 Not Implemented
DL0104 # 14 Y:2013 14 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $29,700 $1,320 Not Implemented
DL0104 # 13 Y:2013 13 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $10,200 $3,800 Not Implemented
DL0104 # 12 Y:2013 12 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,500 $31,050 Not Implemented
DL0104 # 11 Y:2013 11 2013 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $48,100 $50,000 Not Implemented