Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
398
matching recommendationsSIC | 3613 | Switchgear And Switchboard Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0006 # 02 Y:2022 | 02 | 2022 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $435 | $162 | Implemented |
MU0006 # 01 Y:2022 | 01 | 2022 | INSTALL OCCUPANCY SENSORS | $1,166 | $2,987 | Not Implemented |
WV0621 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,862 | $48,343 | Not Implemented |
WV0621 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,302 | $2,408 | Implemented |
WV0621 # 06 Y:2022 | 06 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,888 | $18,000 | Not Implemented |
WV0621 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,366 | $465 | Implemented |
WV0621 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,686 | $23,557 | Not Implemented |
WV0621 # 03 Y:2022 | 03 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,354 | $20,540 | Not Implemented |
WV0621 # 01 Y:2022 | 01 | 2022 | INSTALL OCCUPANCY SENSORS | $12,269 | $21,859 | Implemented |
WV0621 # 08 Y:2022 | 08 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,675 | $3,980 | Not Implemented |
WV0621 # 09 Y:2022 | 09 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $1,010 | $4,122 | Implemented |
WV0621 # 10 Y:2022 | 10 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $601 | $98 | Implemented |
WV0621 # 11 Y:2022 | 11 | 2022 | OPTIMIZE PLANT POWER FACTOR | $596 | $2,747 | Implemented |
WV0621 # 12 Y:2022 | 12 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $582 | $1,321 | Not Implemented |
WV0621 # 13 Y:2022 | 13 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $412 | $1,761 | Implemented |
WV0621 # 14 Y:2022 | 14 | 2022 | INSULATE BARE EQUIPMENT | $139 | $325 | Implemented |
TR0009 # 02 Y:2018 | 02 | 2018 | RECYCLE FLUORESCENT LAMPS | $6,608 | $13,260 | Implemented |
TR0009 # 06 Y:2018 | 06 | 2018 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,315 | $14,000 | Implemented |
TR0009 # 05 Y:2018 | 05 | 2018 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $17,718 | $3,748 | Not Implemented |
TR0009 # 04 Y:2018 | 04 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,987 | $15,373 | Implemented |
TR0009 # 03 Y:2018 | 03 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $814 | $0 | Not Implemented |
TR0009 # 01 Y:2018 | 01 | 2018 | OPTIMIZE PLANT POWER FACTOR | $3,043 | $12,500 | Not Implemented |
BD0488 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,086 | $45,630 | n/a |
BD0488 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $4,187 | $600 | n/a |
BD0488 # 03 Y:2016 | 03 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,115 | $3,770 | n/a |