Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 3613 | Switchgear And Switchboard Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0104 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $20,500 | $780 | Not Implemented |
DL0104 # 19 Y:2013 | 19 | 2013 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $19,700 | $100 | Not Implemented |
DL0104 # 18 Y:2013 | 18 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,900 | $45,000 | Not Implemented |
DL0104 # 17 Y:2013 | 17 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,800 | $37,400 | Not Implemented |
DL0104 # 16 Y:2013 | 16 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $22,505 | $10,700 | Not Implemented |
DL0104 # 15 Y:2013 | 15 | 2013 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $18,800 | $45,000 | Not Implemented |
DL0104 # 14 Y:2013 | 14 | 2013 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $29,700 | $1,320 | Not Implemented |
DL0104 # 13 Y:2013 | 13 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,200 | $3,800 | Not Implemented |
DL0104 # 12 Y:2013 | 12 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $15,500 | $31,050 | Not Implemented |
DL0104 # 11 Y:2013 | 11 | 2013 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $48,100 | $50,000 | Not Implemented |
DL0104 # 10 Y:2013 | 10 | 2013 | MINIMIZE WATER USAGE | $5,100 | $280 | Not Implemented |
DL0104 # 09 Y:2013 | 09 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $30,500 | $700 | Not Implemented |
DL0104 # 08 Y:2013 | 08 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,300 | $9,570 | Not Implemented |
DL0104 # 07 Y:2013 | 07 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,800 | $100 | Not Implemented |
DL0104 # 06 Y:2013 | 06 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,500 | $100 | Not Implemented |
DL0104 # 05 Y:2013 | 05 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,600 | $100 | Not Implemented |
DL0104 # 04 Y:2013 | 04 | 2013 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $18,300 | $100 | Not Implemented |
DL0104 # 03 Y:2013 | 03 | 2013 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $39,500 | $1,000 | Not Implemented |
DL0104 # 01 Y:2013 | 01 | 2013 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $31,000 | $510 | Not Implemented |
RU0162 # 01 Y:1992 | 01 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $90 | $750 | Implemented |
RU0162 # 02 Y:1992 | 02 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11 | $31 | Not Implemented |
RU0162 # 03 Y:1992 | 03 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,196 | $2,500 | Not Implemented |
RU0162 # 04 Y:1992 | 04 | 1992 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $477 | $1,080 | Implemented |
RU0162 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $104 | $24 | Implemented |
RU0162 # 06 Y:1992 | 06 | 1992 | USE RADIANT HEATER FOR SPOT HEATING | $8,910 | $10,500 | Implemented |