IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3613 Switchgear And Switchboard Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0028 # 07 Y:2024 07 2024 UPGRADE CONTROLS ON COMPRESSORS $21,431 $520 Not Implemented
NT0028 # 06 Y:2024 06 2024 OPTIMIZE PLANT POWER FACTOR $11,431 $6,584 Not Implemented
NT0028 # 05 Y:2024 05 2024 APPLY FOR INVESTMENT INCENTIVES $27,609 $10,000 Implemented
NT0028 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,586 $20,775 Implemented
NT0028 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,571 $9,184 Not Implemented
NT0028 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,367 $0 Implemented
NT0028 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,518 $5,609 Implemented
TR0009 # 06 Y:2018 06 2018 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,315 $14,000 Implemented
TR0009 # 05 Y:2018 05 2018 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $17,718 $3,748 Not Implemented
TR0009 # 04 Y:2018 04 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,987 $15,373 Implemented
TR0009 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $814 $0 Not Implemented
TR0009 # 02 Y:2018 02 2018 RECYCLE FLUORESCENT LAMPS $6,608 $13,260 Implemented
TR0009 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $3,043 $12,500 Not Implemented
AM0552 # 07 Y:2008 07 2008 USE SYNTHETIC LUBRICANT $589 $0 Implemented
AM0552 # 06 Y:2008 06 2008 INSULATE BARE EQUIPMENT $1,790 $400 Not Implemented
AM0552 # 05 Y:2008 05 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,790 $500 Implemented
AM0552 # 04 Y:2008 04 2008 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $25,920 $240 Implemented
AM0552 # 03 Y:2008 03 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $26,780 $740 Implemented
AM0552 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,920 $1,500 Implemented
AM0552 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,220 $54,170 Implemented
KG0079 # 06 Y:1997 06 1997 INSTALL MAGAZINES FOR TEMPORARY STORAGE $36,400 $24,750 n/a
KG0079 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $708 $0 n/a
KG0079 # 04 Y:1997 04 1997 INCREASE USE OF AUTOMATION $114,608 $200,000 n/a
KG0079 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,624 $4,980 n/a
KG0079 # 02 Y:1997 02 1997 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,649 $500 n/a