Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 3613 | Switchgear And Switchboard Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0267 # 02 Y:1999 | 02 | 1999 | USE OPTIMUM THICKNESS INSULATION | $19,127 | $1,962 | Not Implemented |
ME0267 # 03 Y:1999 | 03 | 1999 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $7,533 | $2,511 | Implemented |
ME0267 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,078 | $3,870 | Implemented |
ME0267 # 05 Y:1999 | 05 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,496 | $3,800 | Implemented |
ME0267 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,540 | $380 | Not Implemented |
ME0267 # 07 Y:1999 | 07 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,850 | $500 | Implemented |
ME0267 # 08 Y:1999 | 08 | 1999 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $1,990 | $3,900 | Implemented |
ME0267 # 09 Y:1999 | 09 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $836 | $900 | Not Implemented |
ME0267 # 10 Y:1999 | 10 | 1999 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $249 | $900 | Not Implemented |
ME0267 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,913 | $26,510 | Implemented |
NC0157 # 02 Y:1999 | 02 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,307 | $240 | Not Implemented |
NC0157 # 09 Y:1999 | 09 | 1999 | MODIFY STARTUP/SHUTDOWN TIMES | $3,193 | $0 | Implemented |
NC0157 # 08 Y:1999 | 08 | 1999 | ADD ADDITIONAL PRODUCTION SHIFT | $100,000 | $1,000 | Not Implemented |
NC0157 # 07 Y:1999 | 07 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $8,000 | $200 | Implemented |
NC0157 # 06 Y:1999 | 06 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,015 | $3,000 | Implemented |
NC0157 # 05 Y:1999 | 05 | 1999 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $17,776 | $20,000 | Not Implemented |
NC0157 # 04 Y:1999 | 04 | 1999 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $98,761 | $465,000 | Not Implemented |
NC0157 # 03 Y:1999 | 03 | 1999 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,654 | $2,000 | Not Implemented |
NC0157 # 01 Y:1999 | 01 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,968 | $1,500 | Not Implemented |
TN0651 # 02 Y:1999 | 02 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $9,040 | $9,140 | Implemented |
TN0651 # 07 Y:1999 | 07 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $880 | $1,120 | Not Implemented |
TN0651 # 06 Y:1999 | 06 | 1999 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $1,465 | $2,420 | Not Implemented |
TN0651 # 05 Y:1999 | 05 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $2,625 | $900 | Not Implemented |
TN0651 # 03 Y:1999 | 03 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,840 | $8,000 | Not Implemented |
TN0651 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $23,000 | $21,000 | Not Implemented |