Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
551
matching recommendationsSIC | 362 | Electrical Industrial Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0013 # 04 Y:1987 | 04 | 1987 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $840 | $1,500 | Implemented |
WI0013 # 05 Y:1987 | 05 | 1987 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $882 | $700 | Implemented |
ST0066 # 01 Y:1986 | 01 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,389 | $1,400 | Implemented |
ST0066 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,035 | $0 | Implemented |
ST0066 # 03 Y:1986 | 03 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $148 | $100 | Implemented |
ST0066 # 06 Y:1986 | 06 | 1986 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $18,041 | $0 | Implemented |
ST0066 # 07 Y:1986 | 07 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $5,537 | $1,000 | Implemented |
ST0066 # 10 Y:1986 | 10 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $413 | $0 | Implemented |
KU0176 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,562 | $1,540 | Implemented |
KU0176 # 05 Y:1985 | 05 | 1985 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $203 | $0 | Implemented |
KU0176 # 06 Y:1985 | 06 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $188 | $60 | Implemented |
ST0035 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,841 | $13,140 | Implemented |
ST0035 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,014 | $240 | Implemented |
ST0035 # 04 Y:1985 | 04 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $106 | $0 | Implemented |
ST0035 # 14 Y:1985 | 14 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $25,586 | $3,500 | Implemented |
TN0236 # 01 Y:1984 | 01 | 1984 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $2,574 | $836 | Implemented |
OK0142 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $164 | $268 | Implemented |
OK0142 # 02 Y:1984 | 02 | 1984 | REDUCE VENTILATION AIR | $125 | $0 | Implemented |
OK0142 # 04 Y:1984 | 04 | 1984 | INSULATE BARE EQUIPMENT | $488 | $58 | Implemented |
OK0048 # 03 Y:1982 | 03 | 1982 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $35 | $17 | Implemented |
UD0039 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,698 | $1,557 | Implemented |
UD0039 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $480 | $0 | Implemented |
UD0039 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $357 | $300 | Implemented |
UD0039 # 04 Y:1982 | 04 | 1982 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $7,302 | $13,500 | Implemented |
UD0039 # 05 Y:1982 | 05 | 1982 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,253 | $7,000 | Implemented |