IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

544

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0066 # 10 Y:1986 10 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $413 $0 Implemented
KU0176 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,562 $1,540 Implemented
KU0176 # 05 Y:1985 05 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $203 $0 Implemented
KU0176 # 06 Y:1985 06 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $188 $60 Implemented
ST0035 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,841 $13,140 Implemented
ST0035 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,014 $240 Implemented
ST0035 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $106 $0 Implemented
ST0035 # 14 Y:1985 14 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,586 $3,500 Implemented
TN0236 # 01 Y:1984 01 1984 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $2,574 $836 Implemented
OK0142 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $268 Implemented
OK0142 # 02 Y:1984 02 1984 REDUCE VENTILATION AIR $125 $0 Implemented
OK0142 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $488 $58 Implemented
OK0048 # 03 Y:1982 03 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $35 $17 Implemented
UD0039 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,698 $1,557 Implemented
UD0039 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $480 $0 Implemented
UD0039 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $357 $300 Implemented
UD0039 # 04 Y:1982 04 1982 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $7,302 $13,500 Implemented
UD0039 # 05 Y:1982 05 1982 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,253 $7,000 Implemented
UD0031 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $256 $0 Implemented