IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,323

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0729 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,930 $1,000 Implemented
AM0729 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $3,770 $1,000 Not Implemented
AM0729 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $580 $220 Implemented
DL0171 # 10 Y:2016 10 2016 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,505 $1,524 Not Implemented
DL0171 # 11 Y:2016 11 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,192 $3,840 Not Implemented
DL0171 # 12 Y:2016 12 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $4,030 $0 Implemented
DL0171 # 13 Y:2016 13 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $890 $4,170 Not Implemented
DL0171 # 01 Y:2016 01 2016 INSTALL SYSTEM TO COLLECT SCRAP $4,328 $360 Not Implemented
DL0171 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,059 $4,224 Not Implemented
DL0171 # 03 Y:2016 03 2016 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $374 $0 Implemented
DL0171 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,863 $11,400 Not Implemented
DL0171 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,572 $11,400 Not Implemented
DL0171 # 06 Y:2016 06 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,076 $431 Not Implemented
DL0171 # 07 Y:2016 07 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,885 $0 Implemented
DL0171 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $6,911 $588 Not Implemented
DL0171 # 09 Y:2016 09 2016 INSTALL AUTOMATIC STACK DAMPER $624 $205 Not Implemented
SU0418 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $722 $0 Not Implemented
SU0418 # 02 Y:2016 02 2016 PAY BILLS ON TIME TO AVOID LATE FEES $641 $0 Implemented
SU0418 # 03 Y:2016 03 2016 DISCONNECT BALLASTS $870 $0 Not Implemented
SU0418 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $336 $333 Implemented
SU0418 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $729 $1,308 Not Implemented
BD0483 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $7,762 $1,810 Not Implemented
BD0483 # 02 Y:2016 02 2016 USE RADIANT HEATER FOR SPOT HEATING $4,162 $8,800 Not Implemented
BD0483 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,053 $10,965 Not Implemented
BD0483 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,476 $15 Not Implemented