IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,323

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0588 # 08 Y:2000 08 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $24,375 $65,000 Not Implemented
TN0672 # 01 Y:2000 01 2000 MOVE PRODUCT USING MECHANICAL MEANS $65,150 $167,200 Not Implemented
TN0672 # 02 Y:2000 02 2000 MINIMIZE USE OF RAGS THROUGH WORKER TRAINING $30,000 $0 Not Implemented
TN0672 # 03 Y:2000 03 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $18,266 $27,000 Not Implemented
TN0672 # 04 Y:2000 04 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,770 $17,800 Not Implemented
TN0672 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $13,010 $1,650 Not Implemented
TN0672 # 06 Y:2000 06 2000 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $8,990 $19,000 Not Implemented
TN0672 # 07 Y:2000 07 2000 REDUCE OR ELIMINATE WASTE $8,100 $3,650 Not Implemented
TN0672 # 08 Y:2000 08 2000 RECOVER WASTE HEAT FROM EQUIPMENT $7,385 $13,750 Not Implemented
TN0672 # 09 Y:2000 09 2000 COVER OPEN TANKS $7,260 $1,500 Not Implemented
TN0672 # 10 Y:2000 10 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $6,380 $13,800 Not Implemented
TN0672 # 11 Y:2000 11 2000 USE SYNTHETIC LUBRICANT $3,630 $0 Not Implemented
TN0672 # 12 Y:2000 12 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,770 $1,440 Not Implemented
TN0672 # 13 Y:2000 13 2000 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $1,920 $5,000 Not Implemented
WV0180 # 01 Y:1999 01 1999 USE SYNTHETIC LUBRICANT $1,188 $867 Implemented
WV0180 # 02 Y:1999 02 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $30 $0 Implemented
WV0180 # 03 Y:1999 03 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $87 $423 Not Implemented
WV0180 # 04 Y:1999 04 1999 USE OPTIMUM THICKNESS INSULATION $2,992 $1,125 Not Implemented
WV0180 # 05 Y:1999 05 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $39,780 $3,000 Implemented
WV0180 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,447 $27 Not Implemented
WV0180 # 07 Y:1999 07 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $71,180 $39,000 Not Implemented
WV0180 # 08 Y:1999 08 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $370 $90 Not Implemented
WV0180 # 09 Y:1999 09 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $550 $201 Implemented
WV0180 # 10 Y:1999 10 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $750 $250 Not Implemented
WV0180 # 11 Y:1999 11 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $1,107 $50 Not Implemented