Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,323
matching recommendationsSIC | 362 | Electrical Industrial Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0588 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $24,375 | $65,000 | Not Implemented |
TN0672 # 01 Y:2000 | 01 | 2000 | MOVE PRODUCT USING MECHANICAL MEANS | $65,150 | $167,200 | Not Implemented |
TN0672 # 02 Y:2000 | 02 | 2000 | MINIMIZE USE OF RAGS THROUGH WORKER TRAINING | $30,000 | $0 | Not Implemented |
TN0672 # 03 Y:2000 | 03 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $18,266 | $27,000 | Not Implemented |
TN0672 # 04 Y:2000 | 04 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $14,770 | $17,800 | Not Implemented |
TN0672 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,010 | $1,650 | Not Implemented |
TN0672 # 06 Y:2000 | 06 | 2000 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $8,990 | $19,000 | Not Implemented |
TN0672 # 07 Y:2000 | 07 | 2000 | REDUCE OR ELIMINATE WASTE | $8,100 | $3,650 | Not Implemented |
TN0672 # 08 Y:2000 | 08 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,385 | $13,750 | Not Implemented |
TN0672 # 09 Y:2000 | 09 | 2000 | COVER OPEN TANKS | $7,260 | $1,500 | Not Implemented |
TN0672 # 10 Y:2000 | 10 | 2000 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $6,380 | $13,800 | Not Implemented |
TN0672 # 11 Y:2000 | 11 | 2000 | USE SYNTHETIC LUBRICANT | $3,630 | $0 | Not Implemented |
TN0672 # 12 Y:2000 | 12 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,770 | $1,440 | Not Implemented |
TN0672 # 13 Y:2000 | 13 | 2000 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $1,920 | $5,000 | Not Implemented |
WV0180 # 01 Y:1999 | 01 | 1999 | USE SYNTHETIC LUBRICANT | $1,188 | $867 | Implemented |
WV0180 # 02 Y:1999 | 02 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $30 | $0 | Implemented |
WV0180 # 03 Y:1999 | 03 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $87 | $423 | Not Implemented |
WV0180 # 04 Y:1999 | 04 | 1999 | USE OPTIMUM THICKNESS INSULATION | $2,992 | $1,125 | Not Implemented |
WV0180 # 05 Y:1999 | 05 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $39,780 | $3,000 | Implemented |
WV0180 # 06 Y:1999 | 06 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,447 | $27 | Not Implemented |
WV0180 # 07 Y:1999 | 07 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $71,180 | $39,000 | Not Implemented |
WV0180 # 08 Y:1999 | 08 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $370 | $90 | Not Implemented |
WV0180 # 09 Y:1999 | 09 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $550 | $201 | Implemented |
WV0180 # 10 Y:1999 | 10 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $750 | $250 | Not Implemented |
WV0180 # 11 Y:1999 | 11 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,107 | $50 | Not Implemented |