Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,337
matching recommendationsSIC | 362 | Electrical Industrial Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0129 # 05 Y:1995 | 05 | 1995 | INSTALL OCCUPANCY SENSORS | $1,675 | $2,002 | Implemented |
SD0129 # 06 Y:1995 | 06 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $815 | $980 | Implemented |
MO0151 # 01 Y:1995 | 01 | 1995 | USE RADIANT HEATER FOR SPOT HEATING | $27,601 | $17,901 | Not Implemented |
MO0151 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,472 | $15,370 | Implemented |
MO0151 # 03 Y:1995 | 03 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $530 | $25 | Not Implemented |
MO0151 # 04 Y:1995 | 04 | 1995 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $9,918 | $2,845 | Not Implemented |
MO0151 # 05 Y:1995 | 05 | 1995 | USE PLASTIC PALLETS INSTEAD OF WOOD | $38,520 | $36,113 | Not Implemented |
NC0049 # 01 Y:1995 | 01 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,182 | $1,290 | Implemented |
NC0049 # 02 Y:1995 | 02 | 1995 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $13,275 | $180,000 | Not Implemented |
NC0049 # 03 Y:1995 | 03 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,443 | $8,000 | Not Implemented |
NC0049 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,293 | $432 | Not Implemented |
NC0049 # 05 Y:1995 | 05 | 1995 | INSTALL OCCUPANCY SENSORS | $1,245 | $3,600 | Not Implemented |
NC0049 # 06 Y:1995 | 06 | 1995 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,915 | $2,000 | Implemented |
NC0049 # 07 Y:1995 | 07 | 1995 | ADD AREA LIGHTING SWITCHES | $478 | $1,200 | Not Implemented |
NC0049 # 08 Y:1995 | 08 | 1995 | REDUCE GLAZED AREAS IN BUILDINGS | $5,285 | $1,400 | Implemented |
NC0049 # 09 Y:1995 | 09 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,233 | $4,000 | Not Implemented |
NC0049 # 10 Y:1995 | 10 | 1995 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $10,722 | $2,115 | Not Implemented |
UM0017 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,369 | $1,100 | Implemented |
UM0017 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,281 | $16,346 | Implemented |
UM0017 # 03 Y:1995 | 03 | 1995 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,994 | $35 | Not Implemented |
UM0017 # 04 Y:1995 | 04 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,199 | $4,680 | Not Implemented |
UM0017 # 05 Y:1995 | 05 | 1995 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,232 | $0 | Implemented |
UM0017 # 06 Y:1995 | 06 | 1995 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $3,090 | $2,500 | Not Implemented |
SD0104 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $24,474 | $22,100 | Implemented |
SD0104 # 02 Y:1995 | 02 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,382 | $9,800 | Not Implemented |