IAC Assessment: WI0257
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0257
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1996
Principal Product Variable frequency drives
NAICS n/a
SIC 3625 - Relays And Industrial Controls
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 500,000
Annual Production 20,000 Pieces
Production Hrs. Annual 4,125
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,478 1,000,879 kWh $0.04
Electricity Demand $31,762 2,810 kW-months/year $11.30
Electricity Fees $(-536) - $ -
Natural Gas $3,177 747 MMBtu $4.25
TOTAL ENERGY COSTS $69,881
RECOMMENDED SAVINGS* $19,996 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ Tgal $ lb
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,977
Cost:
-
- - $7,977 672 - - - - -
-
kWh
$7,977
672
kW-months/year
-
-
Tgal
-
-
lb
02: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF Savings:
$5,468
Cost:
$15,000
$3,598 96,717 $3,587 302 $(-1,717) (-715,680) - - $3,598
96,717
kWh
$3,587
302
kW-months/year
$(-1,717)
(-715,680)
Tgal
-
-
lb
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,982
Cost:
$7,000
- - - - - - $2,982 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$2,982
-
lb
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,323
Cost:
$3,075
$2,323 62,427 - - - - - - $2,323
62,427
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,246
Cost:
-
$734 19,637 $512 43 - - - - $734
19,637
kWh
$512
43
kW-months/year
-
-
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$19,996
Cost:
$25,075
$6,655 178,781 $12,076 1,017 $(-1,717) (-715,680) $2,982 - $6,655
178,781
kWh
$12,076
1,017
kW-months/year
$(-1,717)
(-715,680)
Tgal
$2,982
-
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz)