IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,306

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0508 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $875 $1,160 Not Implemented
SU0508 # 06 Y:2021 06 2021 RECOVER WASTE HEAT FROM EQUIPMENT $12,878 $15,784 Not Implemented
SU0508 # 05 Y:2021 05 2021 ELIMINATE/REDUCE AN OPERATION $4,431 $5,566 Not Implemented
SU0508 # 04 Y:2021 04 2021 INSTALL / REPAIR INSULATION ON STEAM LINES $202 $107 Not Implemented
SU0508 # 03 Y:2021 03 2021 REDUCE VENTILATION AIR $2,405 $499 Not Implemented
SU0508 # 02 Y:2021 02 2021 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $775 $81 Not Implemented
SU0508 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $33 $0 Not Implemented
UK2105 # 11 Y:2021 11 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,807 $400 n/a
UK2105 # 10 Y:2021 10 2021 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,248 $1,000 n/a
UK2105 # 09 Y:2021 09 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,619 $644 n/a
UK2105 # 08 Y:2021 08 2021 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,440 $1,484 n/a
UK2105 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $1,473 $3,200 n/a
UK2105 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $748 $540 n/a
UK2105 # 05 Y:2021 05 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $185 $332 n/a
UK2105 # 04 Y:2021 04 2021 INSULATE BARE EQUIPMENT $1,049 $994 n/a
UK2105 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,309 $2,702 n/a
UK2105 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,578 $0 n/a
UK2105 # 01 Y:2021 01 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $701 $0 n/a
LE0502 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,993 $17,900 Implemented
LE0502 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,020 $17,500 Implemented
LE0502 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $757 $1,800 Implemented
LE0502 # 01 Y:2021 01 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,768 $200 Implemented
SD0599 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,596 $4,732 Not Implemented
SD0599 # 01 Y:2020 01 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,200 $33,000 Not Implemented
SD0599 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,284 $8,600 Not Implemented