IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,371

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0019 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,486 $33,471 Not Implemented
NT0019 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $36,036 $9,814 Not Implemented
NT0019 # 04 Y:2024 04 2024 APPLY FOR INVESTMENT INCENTIVES $12,574 $0 Not Implemented
NT0019 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,487 $4,553 Not Implemented
UC2306 # 12 Y:2023 12 2023 USE HEAT PUMP FOR SPACE CONDITIONING $20,361 $73,450 Not Implemented
UC2306 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $429 $1,916 Not Implemented
UC2306 # 10 Y:2023 10 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $207 $733 Not Implemented
UC2306 # 09 Y:2023 09 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,865 $22,297 Not Implemented
UC2306 # 08 Y:2023 08 2023 INSTALL TIMERS AND/OR THERMOSTATS $1,986 $3,066 Not Implemented
UC2306 # 07 Y:2023 07 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,153 $34,274 Implemented
UC2306 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $70,539 $385,242 Not Implemented
UC2306 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,621 $1,600 Not Implemented
UC2306 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $795 $600 Not Implemented
UC2306 # 03 Y:2023 03 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $375 $0 Implemented
UC2306 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,636 $11,635 Implemented
UC2306 # 01 Y:2023 01 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $2,520 $0 Not Implemented
MS0414 # 04 Y:2023 04 2023 RECOVER WASTE HEAT FROM EQUIPMENT $11,747 $144,100 Not Implemented
MS0414 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $45,723 $532,875 Not Implemented
MS0414 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,129 $37,628 Not Implemented
MS0414 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,690 $1,580 Not Implemented
UU0218 # 02 Y:2023 02 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $7,404 $5,700 Implemented
UU0218 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $8,860 $4,445 Not Implemented
UU0218 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,223 $53,198 Implemented
UU0218 # 04 Y:2023 04 2023 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $3,088 $3,300 Not Implemented
UU0218 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $2,944 $78,979 Not Implemented