IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0487 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,265 $4,500 n/a
UM0487 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,701 $105,530 n/a
UM0487 # 03 Y:2017 03 2017 COVER OPEN TANKS $23,071 $2,137 n/a
UM0129 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,119 $13,195 Not Implemented
UM0129 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,707 $23,612 Not Implemented
UM0129 # 03 Y:1999 03 1999 REPLACE BOILER $78,528 $13,800 Not Implemented
UM0129 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $24,159 $17,000 Not Implemented
UM0129 # 05 Y:1999 05 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $56,391 $122,400 Not Implemented
UM0129 # 06 Y:1999 06 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $3,463 $19,860 Not Implemented
UM0017 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,369 $1,100 Implemented
UM0017 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,281 $16,346 Implemented
UM0017 # 03 Y:1995 03 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,994 $35 Not Implemented
UM0017 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,199 $4,680 Not Implemented
UM0017 # 05 Y:1995 05 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,232 $0 Implemented
UM0017 # 06 Y:1995 06 1995 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,090 $2,500 Not Implemented