Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 362 | Electrical Industrial Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0564 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,789 | $100 | n/a |
LE0564 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,016 | $0 | n/a |
LE0564 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,320 | $61,333 | n/a |
LE0564 # 10 Y:2024 | 10 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $697 | $3,400 | n/a |
LE0564 # 09 Y:2024 | 09 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,861 | $13,312 | n/a |
LE0564 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,023 | $4,500 | n/a |
LE0564 # 07 Y:2024 | 07 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,314 | $4,000 | n/a |
LE0564 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $357 | $1,080 | n/a |
LE0564 # 05 Y:2024 | 05 | 2024 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $10,054 | $5,500 | n/a |
LE0564 # 04 Y:2024 | 04 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $3,800 | $400 | n/a |
LE0564 # 03 Y:2024 | 03 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $5,156 | $200 | n/a |
LE0273 # 06 Y:2008 | 06 | 2008 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,118 | $6,000 | Not Implemented |
LE0273 # 05 Y:2008 | 05 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,907 | $214 | Not Implemented |
LE0273 # 04 Y:2008 | 04 | 2008 | USE SOLAR HEAT TO HEAT WATER | $10,101 | $2,730 | Not Implemented |
LE0273 # 03 Y:2008 | 03 | 2008 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $11,082 | $1,560 | Not Implemented |
LE0273 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,519 | $1,440 | Implemented |
LE0273 # 01 Y:2008 | 01 | 2008 | USE SOLAR HEAT TO MAKE ELECTRICTY | $40,528 | $972,000 | Not Implemented |
LE0273 # 07 Y:2008 | 07 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,895 | $7,800 | Implemented |
LE0273 # 08 Y:2008 | 08 | 2008 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $4,177 | $3,120 | Not Implemented |
LE0273 # 09 Y:2008 | 09 | 2008 | INSTALL OCCUPANCY SENSORS | $381 | $180 | Not Implemented |
LE0273 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,813 | $42,521 | Implemented |
HO0173 # 07 Y:1998 | 07 | 1998 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $4,478 | $500 | Not Implemented |
HO0173 # 04 Y:1998 | 04 | 1998 | INSTALL OCCUPANCY SENSORS | $2,983 | $600 | Not Implemented |
HO0173 # 03 Y:1998 | 03 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,033 | $120 | Not Implemented |
HO0173 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,250 | $1,569 | Not Implemented |