IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0131 # 06 Y:2014 06 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $206,605 $247,740 Not Implemented
TT0131 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,347 $972 Not Implemented
TT0131 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,605 $30,150 Not Implemented
TT0131 # 05 Y:2014 05 2014 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $3,687 $8,925 Not Implemented
TT0131 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,202 $16,590 Implemented
TT0131 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,715 $63,236 Implemented
TN0682 # 07 Y:2000 07 2000 COVER OPEN TANKS $505 $800 Not Implemented
TN0682 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,650 $215 Not Implemented
TN0682 # 05 Y:2000 05 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $6,460 $3,340 Not Implemented
TN0682 # 04 Y:2000 04 2000 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $27,490 $300 Not Implemented
TN0682 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,410 $49,230 Not Implemented
TN0682 # 02 Y:2000 02 2000 $30,000 $26,000 Implemented
TN0682 # 01 Y:2000 01 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $37,600 $7,800 Implemented
TN0672 # 11 Y:2000 11 2000 USE SYNTHETIC LUBRICANT $3,630 $0 Not Implemented
TN0672 # 13 Y:2000 13 2000 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $1,920 $5,000 Not Implemented
TN0672 # 01 Y:2000 01 2000 $65,150 $167,200 Not Implemented
TN0672 # 10 Y:2000 10 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $6,380 $13,800 Not Implemented
TN0672 # 09 Y:2000 09 2000 COVER OPEN TANKS $7,260 $1,500 Not Implemented
TN0672 # 08 Y:2000 08 2000 RECOVER WASTE HEAT FROM EQUIPMENT $7,385 $13,750 Not Implemented
TN0672 # 07 Y:2000 07 2000 REDUCE OR ELIMINATE WASTE $8,100 $3,650 Not Implemented
TN0672 # 06 Y:2000 06 2000 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $8,990 $19,000 Not Implemented
TN0672 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $13,010 $1,650 Not Implemented
TN0672 # 04 Y:2000 04 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,770 $17,800 Not Implemented
TN0672 # 03 Y:2000 03 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $18,266 $27,000 Not Implemented
TN0672 # 02 Y:2000 02 2000 MINIMIZE USE OF RAGS THROUGH WORKER TRAINING $30,000 $0 Not Implemented