IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0673 # 02 Y:2024 02 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $20,643 $75,157 n/a
WV0673 # 01 Y:2024 01 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $55,596 $232,663 n/a
WV0673 # 13 Y:2024 13 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $177 $688 n/a
WV0673 # 12 Y:2024 12 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $179 $80 n/a
WV0673 # 11 Y:2024 11 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $470 $887 n/a
WV0673 # 10 Y:2024 10 2024 UPGRADE CONTROLS ON COMPRESSORS $613 $3,000 n/a
WV0673 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $560 n/a
WV0673 # 08 Y:2024 08 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,740 $1,420 n/a
WV0673 # 07 Y:2024 07 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,917 $5,832 n/a
WV0673 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,382 $16,575 n/a
WV0673 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $4,399 $2,317 n/a
WV0673 # 04 Y:2024 04 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,359 $6,620 n/a
WV0673 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $6,139 $11,569 n/a
OD0139 # 02 Y:1999 02 1999 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $447 $4,020 Not Implemented
OD0139 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,834 $61,640 Not Implemented
OD0139 # 03 Y:1999 03 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $82 $20 Not Implemented
OD0139 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,555 $2,000 Not Implemented
AT0110 # 05 Y:1988 05 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $21,453 $21,000 Implemented
AT0110 # 06 Y:1988 06 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,955 $33,000 Not Implemented
AT0110 # 07 Y:1988 07 1988 RECOVER WASTE HEAT FROM EQUIPMENT $32,558 $5,000 Implemented
AT0110 # 08 Y:1988 08 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $378 $331 Implemented
AT0110 # 04 Y:1988 04 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,784 $0 Not Implemented
AT0110 # 10 Y:1988 10 1988 IMPROVE LUBRICATION PRACTICES $994 $0 Not Implemented
AT0110 # 03 Y:1988 03 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,765 $3,500 Implemented
AT0110 # 02 Y:1988 02 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $25,785 $5,000 Implemented