IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0736 # 06 Y:2006 06 2006 USE PHOTOCELL CONTROLS $3,268 $225 Not Implemented
OK0736 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,322 $1,267 Implemented
OK0736 # 04 Y:2006 04 2006 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,438 $765 Implemented
OK0736 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $224,746 $154,440 Implemented
OK0736 # 02 Y:2006 02 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $447,023 $299,500 Not Implemented
OK0736 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $29,250 $20,340 Implemented
WV0343 # 06 Y:2006 06 2006 DEVELOP A REPAIR/REPLACE POLICY $4,236 $635 Implemented
WV0343 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $11,836 $2,255 Not Implemented
WV0343 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,918 $0 Implemented
WV0343 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $21,955 $3,114 Implemented
WV0343 # 02 Y:2006 02 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,096,704 $1,539,100 Not Implemented
WV0343 # 01 Y:2006 01 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,166,408 $1,460,000 Not Implemented
LE0232 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,445 $51,983 Not Implemented
LE0232 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $7,549 $2,440 Not Implemented
LE0232 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $363 $500 Not Implemented
LE0232 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $809 $60 Not Implemented
LE0232 # 05 Y:2006 05 2006 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,612 $620 Not Implemented
LE0232 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,787 $500 Not Implemented
LE0232 # 03 Y:2006 03 2006 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $7,750 $3,510 Not Implemented
LE0232 # 02 Y:2006 02 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $33,102 $38,465 Not Implemented
LE0232 # 01 Y:2006 01 2006 MODIFY WORKLOAD $35,100 $3,200 Not Implemented