IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

580

matching recommendations
Reset
SIC 3621 Motors And Generators
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0649 # 06 Y:2011 06 2011 REDUCE VENTILATION AIR $3,200 $60 Not Implemented
CO0649 # 07 Y:2011 07 2011 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $2,770 $60 Not Implemented
CO0649 # 08 Y:2011 08 2011 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,150 $60 Not Implemented
AM0571 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $34,630 $98,400 Not Implemented
AM0571 # 02 Y:2010 02 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $33,740 $2,160 Not Implemented
AM0571 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,200 $300 Implemented
AM0571 # 04 Y:2010 04 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,010 $31,300 Implemented
AM0571 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,400 $1,500 Implemented
AM0571 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,700 $1,900 Implemented
AM0571 # 07 Y:2010 07 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,605 $0 Implemented
AM0571 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $1,500 Implemented
SU0286 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,756 $0 Implemented
SU0286 # 02 Y:2009 02 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,876 $0 Not Implemented
SU0286 # 03 Y:2009 03 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,389 $0 Not Implemented
SU0286 # 04 Y:2009 04 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,215 $0 Implemented
SU0286 # 05 Y:2009 05 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,974 $0 Not Implemented
SU0286 # 06 Y:2009 06 2009 DISCONNECT BALLASTS $1,462 $0 Not Implemented
SU0286 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,080 $287 Implemented
SU0286 # 08 Y:2009 08 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $400 $457 Not Implemented
SU0286 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $318 $337 Not Implemented
SU0286 # 10 Y:2009 10 2009 INSTALL OCCUPANCY SENSORS $102 $664 Not Implemented
OK0770 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,297 $0 Implemented
OK0770 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,597 $0 Implemented
OK0770 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $669 $1,056 Implemented
OK0770 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $8,014 $5,534 Not Implemented