IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
SIC 3624 Carbon And Graphite Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0242 # 10 Y:2024 10 2024 UPGRADE OBSOLETE EQUIPMENT $12,250 $84,300 Implemented
UU0242 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $139,774 $4,000 Implemented
UU0242 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,164 $37,300 Implemented
UU0242 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,658 $13,800 Implemented
UU0242 # 07 Y:2024 07 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,520 $9,510 Implemented
UU0242 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $5,187 $5,143 Implemented
LE0502 # 01 Y:2021 01 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,768 $200 Implemented
LE0502 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,020 $17,500 Implemented
LE0502 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $757 $1,800 Implemented
LE0502 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,993 $17,900 Implemented
MZ0252 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $516 $50 Implemented
MZ0252 # 02 Y:2018 02 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,478 $32,500 Implemented
MZ0252 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,159 $0 Implemented
MZ0252 # 01 Y:2018 01 2018 INSTALL SPECTRAL REFLECTORS / DELAMP $4,011 $540 Implemented
MZ0252 # 05 Y:2018 05 2018 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $65,281 $50,000 Implemented
WV0544 # 12 Y:2017 12 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,588 $2,000 Implemented
WV0544 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,362 $0 Implemented
WV0544 # 13 Y:2017 13 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,526 $732 Implemented
WV0544 # 08 Y:2017 08 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,299 $1,000 Implemented
WV0544 # 10 Y:2017 10 2017 DEVELOP A REPAIR/REPLACE POLICY $4,065 $1,108 Implemented
WV0544 # 04 Y:2017 04 2017 RECYCLE WHITE WATER $61,512 $25,000 Implemented
DL0171 # 12 Y:2016 12 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $4,030 $0 Implemented
DL0171 # 03 Y:2016 03 2016 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $374 $0 Implemented
DL0171 # 07 Y:2016 07 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,885 $0 Implemented
OK0891 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,744 $13,618 Implemented