IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

205

matching recommendations
Reset
SIC 3624 Carbon And Graphite Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0736 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,322 $1,267 Implemented
OK0736 # 06 Y:2006 06 2006 USE PHOTOCELL CONTROLS $3,268 $225 Not Implemented
WV0343 # 01 Y:2006 01 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,166,408 $1,460,000 Not Implemented
WV0343 # 02 Y:2006 02 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,096,704 $1,539,100 Not Implemented
WV0343 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $21,955 $3,114 Implemented
WV0343 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,918 $0 Implemented
WV0343 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $11,836 $2,255 Not Implemented
WV0343 # 06 Y:2006 06 2006 DEVELOP A REPAIR/REPLACE POLICY $4,236 $635 Implemented
WI0489 # 01 Y:2005 01 2005 INSTALL TIMERS AND/OR THERMOSTATS $8,655 $1,600 Implemented
WI0489 # 02 Y:2005 02 2005 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $6,360 $0 Implemented
WI0489 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,677 $758 Implemented
WI0489 # 04 Y:2005 04 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,606 $3,000 Not Implemented
WI0489 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,494 $2,314 Implemented
WI0489 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $782 $0 Implemented
WI0489 # 07 Y:2005 07 2005 IMPROVE LUBRICATION PRACTICES $735 $828 Not Implemented
WI0489 # 08 Y:2005 08 2005 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $815 $0 Implemented
WI0489 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $481 $100 Implemented
WI0489 # 10 Y:2005 10 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $206 $0 Implemented
UM0129 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,119 $13,195 Not Implemented
UM0129 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,707 $23,612 Not Implemented
UM0129 # 03 Y:1999 03 1999 REPLACE BOILER $78,528 $13,800 Not Implemented
UM0129 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $24,159 $17,000 Not Implemented
UM0129 # 05 Y:1999 05 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $56,391 $122,400 Not Implemented
UM0129 # 06 Y:1999 06 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $3,463 $19,860 Not Implemented
WV0120 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $163 $248 Implemented