IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

205

matching recommendations
Reset
SIC 3624 Carbon And Graphite Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0120 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,350 $14,800 Implemented
WV0120 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,241 $3,680 Implemented
WV0120 # 04 Y:1997 04 1997 USE SYNTHETIC LUBRICANT $3,588 $1,275 Not Implemented
WV0120 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,648 $50 Not Implemented
WV0120 # 06 Y:1997 06 1997 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $449,333 $600,000 Not Implemented
WV0120 # 07 Y:1997 07 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,375 $20,800 Not Implemented
WV0120 # 08 Y:1997 08 1997 REUSE / RECYCLE/ SELL PAPER PRODUCTS $120 $100 Implemented
WV0120 # 09 Y:1997 09 1997 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $983,213 $100,000 Not Implemented
UM0017 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,369 $1,100 Implemented
UM0017 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,281 $16,346 Implemented
UM0017 # 03 Y:1995 03 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,994 $35 Not Implemented
UM0017 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,199 $4,680 Not Implemented
UM0017 # 05 Y:1995 05 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,232 $0 Implemented
UM0017 # 06 Y:1995 06 1995 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,090 $2,500 Not Implemented
SD0104 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,474 $22,100 Implemented
SD0104 # 02 Y:1995 02 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,382 $9,800 Not Implemented
SD0104 # 03 Y:1995 03 1995 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,356 $3,400 Not Implemented
SD0104 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $83,952 $150,000 Not Implemented
SD0104 # 05 Y:1995 05 1995 ISOLATE HOT OR COLD EQUIPMENT $890 $0 Not Implemented
SD0104 # 06 Y:1995 06 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $4,248 $3,000 Not Implemented
SD0104 # 07 Y:1995 07 1995 INSTALL TURBULATORS $1,618 $1,600 Not Implemented
SD0104 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,523 $23,647 Implemented
SD0104 # 09 Y:1995 09 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $13,450 $17,980 Implemented
AR0002 # 01 Y:1993 01 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,244 $230 Implemented
AR0002 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,622 $620 Implemented