IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 3624 Carbon And Graphite Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0544 # 01 Y:2017 01 2017 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $455,414 $1,455,300 Not Implemented
WV0544 # 15 Y:2017 15 2017 INSULATE BARE EQUIPMENT $268 $876 Not Implemented
WV0544 # 14 Y:2017 14 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,358 $3,438 Not Implemented
WV0544 # 13 Y:2017 13 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,526 $732 Implemented
WV0544 # 12 Y:2017 12 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,588 $2,000 Implemented
WV0544 # 11 Y:2017 11 2017 UPGRADE CONTROLS ON COMPRESSORS $3,967 $15,395 Not Implemented
WV0544 # 10 Y:2017 10 2017 DEVELOP A REPAIR/REPLACE POLICY $4,065 $1,108 Implemented
WV0544 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,346 $25,467 Not Implemented
WV0544 # 08 Y:2017 08 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,299 $1,000 Implemented
WV0544 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,362 $0 Implemented
WV0544 # 06 Y:2017 06 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $26,543 $125,000 Not Implemented
WV0544 # 05 Y:2017 05 2017 IMPROVE COMBUSTION CONTROL CAPABILITY $50,032 $125,526 Not Implemented
WV0544 # 04 Y:2017 04 2017 RECYCLE WHITE WATER $61,512 $25,000 Implemented
WV0544 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,441 $142,350 Not Implemented
WV0544 # 02 Y:2017 02 2017 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $113,487 $482,000 Not Implemented
WV0343 # 06 Y:2006 06 2006 DEVELOP A REPAIR/REPLACE POLICY $4,236 $635 Implemented
WV0343 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $11,836 $2,255 Not Implemented
WV0343 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,918 $0 Implemented
WV0343 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $21,955 $3,114 Implemented
WV0343 # 02 Y:2006 02 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,096,704 $1,539,100 Not Implemented
WV0343 # 01 Y:2006 01 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,166,408 $1,460,000 Not Implemented
WV0120 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $163 $248 Implemented
WV0120 # 09 Y:1997 09 1997 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $983,213 $100,000 Not Implemented
WV0120 # 08 Y:1997 08 1997 REUSE / RECYCLE/ SELL PAPER PRODUCTS $120 $100 Implemented
WV0120 # 07 Y:1997 07 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,375 $20,800 Not Implemented