IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 3625 Relays And Industrial Controls
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0608 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $340 $1,370 Implemented
CO0608 # 04 Y:2007 04 2007 REPLACE BOILER $23,660 $20,000 Implemented
CO0608 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,470 $60 Implemented
CO0608 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,530 $1,500 Implemented
CO0608 # 01 Y:2007 01 2007 UPGRADE CONTROLS ON COMPRESSORS $11,650 $56,600 Implemented
CO0347 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,550 $18,840 Implemented
CO0347 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,400 $103,210 Not Implemented
CO0347 # 02 Y:1995 02 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $36,010 $6,700 Not Implemented
CO0347 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,270 $3,330 Not Implemented
CO0347 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,640 $5,350 Implemented
CO0347 # 06 Y:1995 06 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,890 $2,880 Implemented
CO0295 # 01 Y:1994 01 1994 ADD AREA LIGHTING SWITCHES $2,190 $500 Not Implemented
CO0295 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $140 $400 Not Implemented
CO0295 # 06 Y:1994 06 1994 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $360 $0 Not Implemented
CO0295 # 05 Y:1994 05 1994 INSTALL AUTOMATIC STACK DAMPER $400 $500 Not Implemented
CO0295 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $500 $670 Not Implemented
CO0295 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,650 $4,520 Not Implemented
CO0295 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,730 $10,620 Not Implemented
CO0190 # 12 Y:1990 12 1990 INSULATE BARE EQUIPMENT $492 $103 Implemented
CO0190 # 01 Y:1990 01 1990 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $18,396 $4,200 Not Implemented
CO0190 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $12,172 $3,000 Implemented
CO0190 # 03 Y:1990 03 1990 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $12,764 $20,000 Implemented
CO0190 # 04 Y:1990 04 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,341 $8,200 Not Implemented
CO0190 # 05 Y:1990 05 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,432 $10,800 Implemented
CO0190 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,041 $3,783 Implemented