IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

206

matching recommendations
Reset
SIC 3629 Electrical Industrial Apparatus, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0273 # 03 Y:2008 03 2008 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $11,082 $1,560 Not Implemented
LE0273 # 04 Y:2008 04 2008 USE SOLAR HEAT TO HEAT WATER $10,101 $2,730 Not Implemented
LE0273 # 05 Y:2008 05 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,907 $214 Not Implemented
LE0273 # 06 Y:2008 06 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,118 $6,000 Not Implemented
LE0273 # 07 Y:2008 07 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,895 $7,800 Implemented
LE0273 # 08 Y:2008 08 2008 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,177 $3,120 Not Implemented
LE0273 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $381 $180 Not Implemented
LE0273 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,813 $42,521 Implemented
AS0400 # 06 Y:2005 06 2005 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $150,000 $80,000 Not Implemented
AS0400 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,951 $100 Not Implemented
AS0400 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,555 $18,393 Not Implemented
AS0400 # 03 Y:2005 03 2005 INSTALL OCCUPANCY SENSORS $224 $750 Not Implemented
AS0400 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,262 $5,000 Not Implemented
AS0400 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $289 $500 Not Implemented
MI0005 # 05 Y:2001 05 2001 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $149,887 $23,328 Not Implemented
MI0005 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,655 $3,000 Not Implemented
MI0005 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,110 $423 Not Implemented
MI0005 # 02 Y:2001 02 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,759 $11 Not Implemented
MI0005 # 01 Y:2001 01 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,307 $1,381 Not Implemented
MI0005 # 06 Y:2001 06 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $41,430 $11,232 Not Implemented
TN0692 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $10,500 $700 Not Implemented
TN0692 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,336 $0 Implemented
TN0692 # 02 Y:2000 02 2000 ADD ADDITIONAL PRODUCTION SHIFT $899,000 $967,000 Implemented
TN0692 # 01 Y:2000 01 2000 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $3,613,000 $645,000 Not Implemented
TN0692 # 07 Y:2000 07 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,600 $900 Implemented